2014/07/12 |
35098587Y |
King Star Construction |
3307.2 Fail To Provide Required Const Fence.work Has Not Been Completed @ Exp 1 @ Street Lvl Leaving This Const Are Open To The Public.partial Stop Work Order.issued Pursuant To 28-207.2 & Posted @ Prem.rem:ere |
Resolve |
$1600.00 |
$72.19 |
2014/03/25 |
35038927R |
Top Shelf Electric Corp. |
Unapproved Unsafe Unsuitable Electrical Equipment Devices Materials Appliances Or Wiring In Use.romex Used In Sidewalk Bridge.rem:comply With Ec Code. |
Resolve |
$1600.00 |
$.00 |
2013/12/27 |
35087101L |
Kings Star Construction C |
Sec. Bc 3303.11 Failure To Maintain Adequate Means Of Egress. Note: Attime Of My Inspection I Observed Workers Working 20'high Using A C Joist On Top Of A Supported Pipe Scaffold Approx 12'high To Access 2nd |
Resolve |
$1600.00 |
$.00 |
2014/05/06 |
35095631Z |
Arif Hussain C/o King Sta |
Failure To Safeguard All Persons & Property Affected By Const Operations For App# 320516385 Noted Due To Construction Activity Materials Hadfallen(plywood)& Damaged Adjacent Property's Awning @ Frony Entrance O |
Resolve |
$1200.00 |
$63.32 |
2014/02/26 |
35089011R |
Marco Polo Design Corp |
Sec. Bc 3301.9.5 Failure To Post Required Sign For Sidewalk Shed. A Sidewalk Shed Has Been Erected Under Permit # 340103747 Issued On 12.6. 13 At Front Of Bldg & No Required Shed Sign Has Been Erected/provided |
Resolve |
$.00 |
$.00 |
2013/12/27 |
35087105Z |
Kings Star Construction C |
Sec. Bc 3314.8. Failure To Provide Guardrails On Supported Pipe Scaffold. Note: At The Time Of My Inspection Workers Were Observed Using A Pipe Scaffolding Approx 12'high W/o Any Guardrails Or Fall Protection |
Resolve |
$1600.00 |
$.00 |
2014/07/12 |
35098586M |
Kings Star Construction |
Failure To Safeguard All Persons And Property Affected By Constructionoperations: Loose And Unsecured Wood Planks And Plywood Sheets Have B Een Placed In Front Of Bldg On Sidewalk. The Planks Cover A Large Ditc |
Resolve |
$1200.00 |
$.00 |
2013/12/27 |
35087104R |
King Star Construction C |
Bc301.7 Failure To Provide Design Drawing For Make Shft Pulley On Second Floor. Note: At Time Of My Inspection I Observed Workers Using A Makeshift Pulley W/two Blocks As Counterweight And A Plank Of Wood Wit |
Resolve |
$1600.00 |
$.00 |
2014/07/12 |
35098585K |
King Star Construction |
Fail To Provide Required'project Info Panel'@ Site.this Is A 6 Story New Bldg Not Yet Completed.the Last Nb Permit #320516385 Was Issued On 10-9-13.rem:provide & Post @ Bldg The Required Project Info Panel. |
Resolve |
$800.00 |
$36.09 |
2013/12/27 |
35087103P |
Kings Star Construction C |
Failure To Safeguard All Persons And Property Affected By Constructionoperations. Note: At Time Of My Inspection Construction Work In Progress, I Observed Workers Laying Blocks Above Adjacent Building 329 Herki |
Resolve |
$2400.00 |
$.00 |
2014/05/15 |
35092264M |
Kings Star Construction C |
Failure To Post'no Smoking Sign'@ Const [email protected] The Time Of My Insp.connst Work In Progress.i Observed No Smoking Sign Posted Through The Entire Const Site.in Violation Of Nyc Fire Code.rem:comply W/ Notice Of V |
Resolve |
$.00 |
$.00 |
2014/07/31 |
35098892K |
Kings Star Construction |
Failure To Provide Required Handrails. No Hand Railing Has Been Provided/installed For Stairs At Front Of Bldg From Street Level To Cellar. Rmdy: Provide/install Hand Railing At Stairs From Street To Cellar At |
Resolve |
$5000.00 |
$.00 |
2014/05/15 |
35092265Y |
Kings Star Construction C |
3301.1.2,failure To Comply W/ Nyc Fire Code.no Permit For Gasoline Flammable Liquied [email protected] The Time Of My Insp Const,work In Progress.i Observed A Fice Gallon Gas Container Full W/ Gas & 4 Generator Working On |
Resolve |
$1600.00 |
$96.26 |
2013/12/27 |
35087102N |
Kings Star Construction C |
Bc3307.6.2 Failure To Provide Overhead Protection At Exit And Entranceof Construction Site. Note:at Time Of My Inspection I Observed Workersworking Approximately 20'above Street Level Laying Blocks No Overhead |
Resolve |
$1600.00 |
$.00 |
2013/12/27 |
35087106K |
Kings Star Construction C |
Sec. Bc 3303.7.2. Failure To Provide Fire Extinguisher As Per Nyc Firecode. Note: At The Time Of My Inspection I Did Not Observe Any Fire Extinguisher At Construction Site,construction Work In Progress W/approx |
Resolve |
$800.00 |
$.00 |
2014/05/15 |
35092263K |
Kings Star Construction C |
Smoking @constr Site Refuse. @the Time Of My Insp Constr Work In Progress. I Observed Evidence Of Smoking Refused @site. I Observed Cigarettes Butts Through The Entire Bldg In Violation Of Nyc Fire Code.rem:com |
Resolve |
$1200.00 |
$54.14 |
2014/01/14 |
35087230H |
Kings Star Construction C |
Bc3301.7 Design Required By Chapter 33 (makeshift Platform Front And Rear Of Proeprty) At Time Of Inspection Makeshift Platform Was In Place Front Of Property,ht Apprx 12'by 20'long. The Platform Is Extended |
Resolve |
$1600.00 |
$.00 |
2014/03/25 |
35038928Z |
Top Shelf Electric Corp |
250.4 Non Current Carying Electrical Conductive Material Is Not Grounded.sidewalk Shed Is Metal Could Be Energised.rem:comply With Ec Code. |
Resolve |
$.00 |
$.00 |