Building & Landlord Data for 255 1st St, Brooklyn, NY 11215

Moderate Risk Building

Apartments at 255 1st St, Brooklyn are more likely to have maintenance issues than 57% of NYC rentals.

  • 62% chance of no major maintenance issues next year
  • 27% chance of one major maintenance issue next year
  • 11% chance of multiple major maintenance issues next year

Building Information

Total Apartments 32
Registered Rent Stabilized Apartments (2017 tax bills) None
Building Listed as Rent Stabilized by the RGB False
Building Class Condo; Residential Unit In Elevator Bldg
Year Built 2008
Zoning Code R8A
Area 38437 sq ft
Stories 12
Tax Abatements None

Landlord Details

Role Name Address
Corporate Owner The Elan Condominium 25 8Th Avenue, Brooklyn
Head Officer Nick Murphy 25 8Th Avenue, Brooklyn
Officer James Chen 25 8Th Avenue, Brooklyn
Agent Thomas Sussewell 25 8Th Avenue, Brooklyn

Building Data Preview

Only the first 10 items in each category are shown.

Housing Protection Department Code Violations (3 found)

Date Filed Date Abated Item Category Status
10/26/18 02/01/19 Section27-2107 Adm Code Owner Failed To File A Valid Registration Statement With The Department As Required By Adm Code Ï¿½ï¿½27-2097 And Is Therefore Subject To Civil Penalties, Prohibited From Certifying Violations, And Denied The Right To Recover Possession Of Premises For Nonpayment Of Rent Until A Valid Registration Statement Is Filed. I Violation Dismissed
12/08/17 02/01/19 Section27-2107 Adm Code Owner Failed To File A Valid Registration Statement With The Department As Required By Adm Code Ï¿½ï¿½27-2097 And Is Therefore Subject To Civil Penalties, Prohibited From Certifying Violations, And Denied The Right To Recover Possession Of Premises For Nonpayment Of Rent Until A Valid Registration Statement Is Filed. I Violation Dismissed
10/20/15 02/02/16 Section27-2107 Adm Code Owner Failed To File A Valid Registration Statement With The Department As Required By Adm Code ?27-2097 And Is Therefore Subject To Civil Penalties, Prohibited From Certifying Violations, And Denied The Right To Recover Possession Of Premises For Nonpayment Of Rent Until A Valid Registration Statement Is Filed. I Violation Dismissed

Environmental Control Board Violations (10 found)

Date Number Respondent Description Status Penalty Balance Due
2019/02/07 35385048R Ataf A Nawaz Bc-3301.1.3 Manufacturer Specifications. All Equipment Shall Be Use Inaccordance W/ The Specifications Of The Manufacturer. Noted:at Time Ofinspection I Observed Suspended Outrigger Beam Scaffold Installed At E Resolve $2500.00 $.00
2006/09/25 34501598K Owner/of 255 1 Street Bro Failure To Provide Approved Plans At Site At Time Of Inspection. No Approved Plans Provided. Remedy: 'stop All Work' Provide Approved Plans. Resolve $.00 $.00
2007/04/20 34565269M Formost Contracting Llc Work W/o Permit- Standpipe Installed. Upon Inspection Stand Pipe System Installed W/o First Obtaining A Permit. Permit: Stop Any & All Work On Standpipe System Obtain Permit As Per Bldg Code. Resolve $500.00 $.00
2014/02/10 38230186H 261 1st Condo Associates 01j01,67l10,61g11,17h11,68m07,69b11,52b11. 01j-adjust Or Replace For Easy Operation; 67l-low Audio And Interference; 61g-unreadable Fuses; 17h-repalce Where Needed; 69b-should Be 96/97 Code; 52b-provide Suffic Resolve $500.00 $.00
2014/02/10 38230187J 261 1st Condo Associates 01j10,67l10,68m07,61g11,69b17,17h11,10h11,52b11. 01j-adjust For Gas() 67l-interference/(); 68m-no Entires; 61g-unusable Fuses; 67b-wrong Code Year; 17h-replace Where Needed; 10h-replace; 52b-provide Sufficient Resolve $500.00 $.00
2017/09/13 35264505M 251 1st Condo Associates Removeal Of Safety Measure Such As Sidewalk Sheds W/o Dept Approveal.at The Time Of Tr6 Inspection Bldg Facade Was Still Designated As Unsafe The Amended Facade Report(tr6)recd On 9/5/17 Had Not Been Accepted A Resolve $400.00 $.00
2010/03/23 34832017J 261 First Condo Associate Jobsite Fence Not Constructed Pursuant To Subsection Inadequate Fence Protection Found @ The Time Of Insp Jobsite Fence Connected To The Bldg#255 On Site Is Defective W/missing Upper Section Approx 24'0'linear Resolve $.00 $.00
2017/12/05 38259742Z The Elan Condominium Asso 59bb5,97x10-59bb5)brake Maintenance Tag Expired On 11/9/16. 97x10)upon Inspection The Device Is Found To Be Out Of Service. Restore To Service Immediately And Notify Nycdob The Device Has Been Returned To Servi Active $2500.00 $2500.00
2008/05/05 38182680J Plan B 83b09. B3b9 Failure To Notify Dob Of Device 3v21682 Removal As Per 18.7 Rule 26.8 & Rule 26.9. Resolve $.00 $.00
2006/11/24 34547478J 261-1st Condo Associates No Sidewalk Shed.new Bldg Under Construction Up To 3rd Story. Remedy:provide Sidewalk Shed. Resolve $2000.00 $.00

Department of Buildings Complaints (10 found)

Date Filed Number Category Status
05/09/2016 3557572 Debris – Excessive CLOSED
09/03/2008 3278295 Fence - None/Inadequate/Illegal CLOSED
06/06/2008 3267631 Sidewalk Shed/Supported Scaffold/Inadequate/Defective/None/No Permit/No Cert CLOSED
05/16/2007 3225572 Debris/Building - Falling or In Danger of Falling CLOSED
04/20/2007 3222704 Safety Net/Guardrail-Damaged/Inadequate/None (over 6 Story/75 ft.) CLOSED
04/26/2007 3223390 Electrical Wiring – Defective/Exposed CLOSED
01/16/2007 3213454 Zoning – Non-conforming CLOSED
01/16/2007 3213453 Permit – None (Building/PA/Demo etc.) CLOSED
11/13/2006 3208344 Sidewalk Shed/Supported Scaffold/Inadequate/Defective/None/No Permit/No Cert CLOSED
09/25/2006 3203965 Work Contrary to Stop Work Order CLOSED

311 Housing Complaints (0 found)

Work Orders (0 found)

Office of Administrative Trials and Hearings Cases (10 found)

Violation Date Agency Respondent Charge Result Penalty Imposed Status
10/30/19 Fire Department Of Nyc Elan Condo C O Goldin Mgmt Inspection And Testing In Violation $1550 Both Due
10/30/19 Fire Department Of Nyc Elan Condo C O Goldin Mgmt Labels Markings In Violation $3100 Both Due
10/30/19 Fire Department Of Nyc Elan Condo C O Goldin Mgmt Electrical Lighting Hazards In Violation $4875 Both Due
06/20/19 Fire Department Of Nyc Elan Condo Fire Protection Systems In Violation $1550 Both Due
06/20/19 Fire Department Of Nyc Elan Condo Sign, Postings, Notices And Instructions In Violation $600 Both Due
06/20/19 Fire Department Of Nyc Elan Condo Electrical Lighting Hazards In Violation $2900 Both Due
02/07/19 Dept. Of Buildings Ataf A Nawaz Miscellaneous Violations In Violation $2500 All Terms Met
12/10/18 Fire Department Of Nyc Golden Management Inspection And Testing Defaulted $1000 Both Due
12/10/18 Fire Department Of Nyc Elaw Condo C O Goldin Mgmt Labels Markings In Violation $2050 Both Due
12/10/18 Fire Department Of Nyc Elan Condo C O Golden Mgmt Inspection And Testing Defaulted $1000 Both Due

Rodents (1 inspections found)

Date Result Type
12/26/17 Passed Inspection Initial

Want more information on 255 1st St, Brooklyn? Click to view all records of code violations, complaints, rat inspections, evictions, vacate orders, tax liens, building permits, sales and more.


See reports on other buildings near 255 1st St, Brooklyn

Browse all buildings on this street Browse all addresses in Brooklyn


About Augrented

Augrented uses public data on apartments and landlords from the San Francisco & New York City Open Data portals and other official sources, to provide apartment and landlord ratings. Access is provided in accordance with California and/or New York State law and SF & NYC agency policies, local laws and ordinances. This service is not provided or endorsed by the DBI, HPD or any other city or government agency.

For informational purposes only. This data is not a credit report, investigative consumer report or background check, and you should not rely on it exclusively to make rental or business decisions. Please verify information with building owners or responsible agencies.