Building & Landlord Data for 1262 Broadway, Brooklyn, NY

Renter Risk Rating
85%

85% chance of no major maintenance issues next year

Low Risk Building

No major maintenance issues predicted.

Apartments at 1262 Broadway, Brooklyn are more likely to have maintenance issues than 83% of NYC rentals.

Building Overview
Source: HPD & RGB
Total units 15
Year built 1931
Rent Stabilized Units None
Floors 6
Tax Abatements 421a (25 yr not cap)
Building Class Hereafter Erected Class A

Code Violations

Class B
2
Class C
4

Complaints

311 complaints
8

Rodents

Rats/problems
0

Ownership & Management

Role Name Address
Corporate Owner 1262 Broadway Equities Llc 5308 13Th Ave, Brooklyn
Head Officer Hershy Beigel 5308 13 Ave, Brooklyn
Agent Hershy Beigel 5308 13 Ave, Brooklyn

Building records

Source: HPD
Date Filed Date Abated Item Category Status
01/14/21 Section 27-2005, 2007 Adm Code Arrange And Make Self-closing The Doors At Apartment In The Entrance Located At Apt 5a, 5th Story, 1st Apartment From East At South C Nov Sent Out
01/14/21 Section 27-2005 Adm Code & 309 M/d Law Abate The Nuisance Consisting Of Hot Water Exceeding Maximum Temperature Of 130.f Degrees At Hot Water Fixtures, Found Temperature Of 138.f Degrees In Kitchen & Bathroom, . In The Entire Apartment Located At Apt 5a, 5th Story, 1st Apartment From East At South C Nov Sent Out
01/14/21 Section 27-2028, 2032 Adm Code Provide An Adequate Supply Of Heat From An Approved Central Heating System, Or An Approved System Of Gas Or Electrical Heating In Good Operating Condition For The Dwelling Unit In The Entire Apartment Located At Apt 5a, 5th Story, 1st Apartment From East At South C Nov Sent Out
11/10/20 Section 27-2026, 2027 Hmc: Properly Repair The Source And Abate The Evidence Of A Water Leak At Ceiling In The 1st Room From North Located At Apt 4c, 4th Story, 2nd Apartment From West At North B Nov Sent Out
11/10/20 Section 329, M/d Law And Dept. Rules And Regs. Provide A Completed Certificate Of Inspection Visits In A Proper Frame At Or Near Mailboxes, Bottom Edge Of Frame Between 48-62 Inches Above Floor .. At Public Hall, 1st Story A Nov Sent Out
11/10/20 Section 27-2005 Adm Code Properly Repair With Similar Material The Broken Or Defective Fire Retardant Material At Ceiling At Public Hall, 1st Story B Nov Sent Out
11/10/20 Section 27-2013 Adm Code Paint With Light Colored Paint To The Satisfaction Of This Department Ceiling At Public Hall, 1st Story A Nov Sent Out
08/06/19 12/05/19 Section 26-1103 Admin. Code: Post And Maintain A Proper Notice On Wall Of The Entrance Story In English And Spanish On The Availability Of The Agency?s Housing Information Guide. A Sample Notice Can Be Found At Www.nyc.gov/hpd. At Public Hall, 1st Story A Violation Dismissed
08/06/19 12/05/19 Section 27-2045 Adm Code Post A Proper Notice Of Smoke Detector Requirements, In A Form Approved By The Commissioner, At Or Near The Mail Box ... At Public Hall, 1st Story A Violation Dismissed
08/06/19 12/05/19 Section 329, M/d Law And Dept. Rules And Regs. Provide A Completed Certificate Of Inspection Visits In A Proper Frame At Or Near Mailboxes, Bottom Edge Of Frame Between 48-62 Inches Above Floor .. At Public Hall, 1st Story A Violation Dismissed
08/06/19 12/05/19 Section 27-2104 Adm Code Post And Maintain A Proper Sign On Wall Of Entrance Story Showing The Registration Number Assigned By The Department And The Address Of The Building. At Public Hall, 1st Story A Violation Dismissed
08/06/19 12/05/19 Section 27-2046.1 Hmc: Post A Proper Notice Of Carbon Monoxide Detecting Device Requirements, In A Form Approved By The Commissioner, In A Common Area Of A Class A Multiple Dwelling Near Inspection Certificate Or Provide Notice To Tenants In A Private Dwelling. At Public Hall, 1st Story A Violation Dismissed
08/06/19 09/27/19 Section 27-2033 Adm Code Post Notice, In Form Approved By The Department, Stating The Name And Location Of The Person Designated By The Owner To Have Key To Buildings Heating System .. At Public Hall, 1st Story C Violation Closed
08/06/19 12/05/19 Section 27-2005 Hmc: Post, In A Form Approved By The Commissioner, And Maintain A Notice In A Common Area Of The Building Regarding The Procedures That Should Be Followed When A Gas Leak Is Suspected A Violation Dismissed
Date Number Respondent Description Status Penalty Balance Due
2007/09/04 34581298L Crown Const Bldrs Failure To Provide Contractors Signs No Contractors Sign Provided On Sidewalk Shed That Was Erected On Broadway Front Of Bldg That Is To Be Demolished.remedy:provide Contractors Sign W/full Name Address Zip Cod Resolve $1000.00 $.00
2010/02/09 34831099H 1262 Broadway Llc Failure To File C/c W/dob Pursuant To 28-204.2 For Vio 34811177x. Remedy: File C/c. Resolve $4000.00 $.00
2009/09/30 34811177X Crown Const Builders Failure To Institute/maintain Safety Equipment Measures, No Guard Rails.defect Noted: At 1st Flr Open Area To Cellar Approx 8x8 Opening In Decking W/o Protection Open To Below At 2nd & 3rd Flrs Open/unprotected Resolve $1200.00 $.00
2013/10/05 35065273K Moshe Riegier C/o Mar Con Job Site Fence Not Constructed Or Maintained In Pursuant Subsection. Job Site Fence Under Renewed Permit #302141778-01-eq-fn Issued 7/5/13. Does Not Comply W/ll47 Of 2013. Construction Fence Is Constructed Of Resolve $.00 $.00
2019/07/23 35445256N The Slce Group Llc Failed To Notify The Department Of An Incident That Resulted In A Fatality Or An Injury.note=a Worker Was Using A Grinder On A Concrete Masonry Unit (cmu) When The Grinder Kicked Back And Cut The Workers Forear Resolve $1250.00 $.00
2000/09/26 34262648Y Chavez Francisco Work Without A Permit Work Noted:seven Metal Columns And Six Wood Columns With Wood Beams Installed At Cellar (2)sheetrock Partitions Constructed At First Story West Section Created Room And Mezzanine Resolve $.00 $.00
2000/09/26 34262649X Chavez Francisco Failure To Maintain Defect Is:first Story Floor Supported By 13 Innadequate Temporary Timber And Metal Columns And Beams(2)hole In Fire Rated Cellar Ceiling At Various Location(lolly Columns And Timber Columns) Resolve $.00 $.00
2019/10/30 39012062R The Slce Group Llc David Failure To Safeguard. At Time Of Inspection Observed At Rear Expo 3 Scaffolding Improperly Planked With Open Holes At All Levels. Area By Balconies No Guardrails With 3' Opening To The Next Balcony. Safety Pins Resolve $10000.00 $10000.00
2019/10/15 35447232H The Slice Group Llc Sec. 3307.6.4.8 Pedestrian Protection Does Not Meet Code Spacifications. Note: At Time Of My Inspection Of A 6 Sty Bldg Under Construction At 6 Sty Stage. No Construction At 6 Sty Stage. No Construction Work In Resolve $2430.00 $2430.00
2019/05/06 35424791M The Slce Group Llc Work Does Not Conform To Approved Construction Documents &/or Approvedamendments. At The Time Of Inspection At New 6 Sty Bldgs,currently At 5th Fl Construction Work In Progress. I Observed Incorrect Cable Syste Resolve $1250.00 $.00
2019/12/06 35513807M The Slce Group Llcdavid E Failure To Comply With The Commissioners Order Contained In Summons/violation #39012062r Issued On 10-30-2019 And To File A Certificate Of Correction Pursuant To 28-201.1 And 1rcny 102-01.b109:failure To Safegu Resolve $625.00 $625.00
2019/04/25 35418428R The Slce Group Llc Bc3309.10/roof Protection;note At Time Of Inspection Of A New Story Building Currently At 5th Flr,construction Work In Progress I Observed No Roof Protection In Place An Adjacent Roof At Corner Of Expo#3 And 4 Resolve $.00 $.00
2019/06/06 35435243P The Slce Group Llc Sec. 3301.6 No Design Drawings. Noted: At Time Of My Inspection Of A New 6 Sty Bldg,i Obsrrved A Wood Platform In The Elevator Shaft At The 5th Fl Approx 8ft X 8ft Constructed Of Scaffold Plank & Plywood,upon Resolve $1250.00 $.00
2019/06/06 35435245Z The Slce Group Llc Work Does Not Conform To Approved Construction Documents &/or Amendments. Noted: At Time Of My Inspection Of A New 6 Sty Bldg,i Observed The Adjoining Property Parapet Wall Had No Protection On It As Shown In Resolve $625.00 $.00
2019/06/06 35435244R The Slce Group Llc Failure To Maintain Adequate Housekeeping Per Section Requirements. Noted: At Time Of My Inspection Of A New 6 Sty Bldg,i Observed Numerious Bags Of Garbage Approx 30 Bags On The 3rd Fl,blocking Walkways Also Resolve $625.00 $.00
2019/04/25 35418427P The Slce Group Llc Handrails.note:at The Time Of My Inspection Of A New 6 Story Building Currently At 5th Flr,construction Work In Progress I Observed Missing And Inadequate Handrails And Stairs Protection From Cellar To 5th Flr Resolve $.00 $.00
2019/04/25 35418429Z The Slce Group Llc Housekeeping.at The Time Of My Inspection Of A New 6 Story Building Currently At 5th Flr,construction Work On Progress I Observed Construction,debris On The Stairs And Landing At Various Floors,creating A Hazar Resolve $625.00 $625.00
2019/12/06 35462652J The Slce Group Llc Bc330372-fire Extinguishers.at The Time Of My Inspection I Observed Multiple Violations Regarding Fire Extinguishers Throughout The Buildingone Needed To Be Re-charged,and Several Others Were Left Standing On T Resolve $625.00 $625.00
2019/12/06 35462653L The Slce Group Llc Inadequate Housekeeping.at The Time Of My Inspection,i Observed Debrisand Other Construction Materials On Several Floors Throughout The Building As Well As Water In The Basement.the Debris Consisted Of Sheetroc Resolve $625.00 $625.00
Source: Department of Buildings
Date Filed Number Category Status
Cell 1 Cell 2 Cell 3 Cell 4
Cell 3 Cell 4 Cell 3 Cell 4
Source: HPD
Status Date Category ID Type Status
Cell 1 Cell 2 Cell 3 Cell 4 Cell 4
Cell 3 Cell 4 Cell 3 Cell 4 Cell 4
Source: DOHMH/311
Date Type Descriptor Status
Cell 1 Cell 2 Cell 3 Cell 4
Cell 3 Cell 4 Cell 3 Cell 4
Source: HPD
Open Date Case Type Status Judgement Penalty Harassment found
Cell 1 Cell 2 Cell 3 Cell 3 Cell 4 Cell 5
Cell 3 Cell 4 Cell 3 Cell 3 Cell 4 Cell 5
Source: Department of Buildings
Effective Date Rescinded Date Reason Type Units
Cell 1 Cell 2 Cell 3 Cell 4 Cell 5
Cell 3 Cell 4 Cell 3 Cell 4 Cell 5
Source: HPD Emergency Repair Program
Date Created Type Description Charge
Cell 1 Cell 2 Cell 3 Cell 4
Cell 3 Cell 4 Cell 3 Cell 4
Source: Office of Administrative Trials & Hearings
Date Agency Respondent Charge Result Penalty Status
Cell 1 Cell 2 Cell 3 Cell 4 Cell 5 Cell 6 Cell 7
Cell 3 Cell 4 Cell 3 Cell 4 Cell 5 Cell 6 Cell 7
Source: Department of Finance
Tax Class Month Water Only
Cell 1 Cell 2 Cell 3
Cell 3 Cell 4 Cell 3
Source: Department of Finance
Date
Cell 3
Source: Department of Buildings
Creation Date Type Status Job
Cell 1 Cell 2 Cell 3 Cell 4
Cell 3 Cell 4 Cell 3 Cell 4
Source: Department of Buildings
Creation Date Status Description Job
Cell 1 Cell 2 Cell 3 Cell 4
Cell 3 Cell 4 Cell 3 Cell 4
Source: DOHMH
Inspection Date Type Result
Cell 1 Cell 2 Cell 3
Cell 3 Cell 4 Cell 3
Source: HPD
Name Role there Address Units Violations Reg. End Date
Cell 1 Cell 2 Cell 2 Cell 3 Cell 4 Cell 4
Cell 3 Cell 2 Cell 4 Cell 3 Cell 4 Cell 4
Source: Department of Finance
Sale Date Sale Price
Cell 1 Cell 2
Cell 3 Cell 4

Introducing Tenancy Protection

Don't let a bad landlord ruin your life! Our unique Tenancy Protection Plans give you peace of mind–and legal help with your landlord if you ever need it, including Eviction Defense coverage.

Read on and rent safer

Need tips on how to find and keep the best apartments, avoid bad landlords and more? Check out our blog for tips every tenant needs!

How Augrented Works

How do you predict what's going to happen at a building? Can landlords pay to change their rating? Answers to these and many more questions here!

Lease fraud: 10 things to look out for

Did you know almost all apartment leases contain at least one unenforceable or misleading clause? Here are some common signs your landlord isn't playing fair.

How to save time apartment hunting

Especially in these risky times, everyone wants to avoid wasted trips to view over-sold apartments. We've put together a guide to screening before even viewing.