Building and Landlord Data Analysis Report

240 Central Park South, Manhattan, NY 10019

29
DOB Complaints
92
311 Housing Calls
34
Housing Violations
56
Permits

Risk Assessment

87
Low Risk

This building shows minimal signs of maintenance issues based on our analysis.

Our AI predicts there is a 87% chance of no major maintenance issues.
Augrented Insights Report for 240 Central Park South

240 Central Park South is a 28-story, 297-unit Class A residential building constructed in 1940, currently owned by Leo Korein. The building has experienced persistent heating and plumbing issues, with multiple heat/hot water complaints in early 2025 (January 8 and 16) affecting both individual apartments and the entire building, and a water supply issue in December 2024. These heating problems appear to be ongoing, with another heating complaint registered in June 2025 as an immediate emergency.

The building has faced significant maintenance challenges, particularly in August 2024, when multiple violations were issued regarding window frame issues in Apartment 6H, involving problems with sashes, counterbalances, and various window panels. The Department of Buildings has an active Local Law 188/17 Compliance Inspections complaint from August 2024. The building underwent substantial work in 2020-2021, generating various Environmental Control Board violations related to construction activities, including failure to provide approved plans, improper site documentation, and electrical work without a permit.

Elevator-related issues were addressed through multiple permits and inspections between 2020-2021, with some violations resolved and penalties paid. Despite these maintenance and compliance challenges, recent bedbug reports (November 2023 - October 2024) show no infestations, and rodent inspections from 2014 to 2020 generally passed, with one instance of rat activity noted in September 2020. The building has received multiple permits in 2022-2024, suggesting ongoing maintenance and improvement work, with several plumbing-related permits issued in May 2024.

Last updated: July 27, 2025
This report is created with AI and based on the most recent 10 data items in each category. Full reports with 50+ data points are available to subscribers.

Download Full Report for 240 Central Park South

Sign up to download the full building report in PDF or Excel format

Sign Up for Free

240 Central Park SouthBuilding Overview

Renter Risk Rating

This building is in the riskiest 10% of buildings in Midtown.

Building Characteristics

Total units 297
Year built 1940
Total area 387428 sq ft
Floors 28
Tax Abatements None
Building Class HEREAFTER ERECTED CLASS A
Preview of building report data and features

Unlock Complete Building History

Get access to comprehensive violation records, court cases, landlord portfolios, and detailed maintenance history for this building and thousands of others.

Full violation history
Landlord portfolios
Court case records
PDF/Excel reports
Sign Up for Free Access
No credit card required • Instant access

Key Building Statistics

29
DOB Complaints
Complaints filed with the Department of Buildings in the last 7 years.
34
Housing Violations
Class B & C housing maintenance code violations.
92
311 Housing Calls
Housing-related 311 service requests in the last 7 years.
1
Work Orders
Repair orders issued by city agencies.
14
ECB Violations
Environmental Control Board violations on record.
2
Evictions
Evictions executed by city marshalls.
1
Rodent Inspections
Rodent inspections conducted by DOHMH.
56
Building Permits
Permits issued by DOB in the last 7 years.

Included Addresses

  • 1792 Broadway, New York, NY 10019
  • 1794 Broadway, New York, NY 10019
  • 1796 Broadway, New York, NY 10019
  • 1798 Broadway, New York, NY 10019
  • 1800 Broadway, New York, NY 10019
  • 1802 Broadway, New York, NY 10019
  • 1804 Broadway, New York, NY 10019
  • 1806 Broadway, New York, NY 10019
  • 1808 Broadway, New York, NY 10019
  • 232 Central Park South, New York, NY 10019
  • 234 Central Park South, New York, NY 10019
  • 236 Central Park South, New York, NY 10019
  • 238 Central Park South, New York, NY 10019
  • 240 Central Park South, New York, NY 10019
  • 242 Central Park South, New York, NY 10019
  • 244 Central Park South, New York, NY 10019
  • 233 West 58th St, New York, NY 10019
  • 235 West 58th St, New York, NY 10019
  • 237 West 58th St, New York, NY 10019
  • 239 West 58th St, New York, NY 10019

Map and Aerial View of 240 Central Park South

Street Map View
Loading map...

Loading street map...

Satellite View
Loading satellite view...

Loading satellite view...

Need Directions?

Click on either map to get detailed directions and explore nearby landmarks, parking options, and accessibility features.

Reviews of 240 Central Park South

See what current and past tenants have to say

No reviews yet

Be the first to share your experience living at this property. Your review helps future tenants make informed decisions.

Rate your experience Share honest feedback Help other tenants

Share Your Experience

Help future tenants by leaving an honest review of this property

Login Required

You must be logged in to leave a review. Join our community and share your experience!

Login to Continue
Don't have an account? Sign up here

240 Central Park South Landlord Information

HPD Registration Contacts

Contact data is from NYC HPD building registration.

RoleNameAddress

Landlord Portfolio

Other NYC buildings registered to this landlord.

AddressUnitsCode ViolationsRisk Rating

Landlord Court Records

NYC housing court and civil court records. Name matching only; verify parties are actually the owners by reviewing the case files!

240 Central Park South Rent Control Status

Year Built
Built before 1974
Units
More than 6 units
RGB Registration
Registered
Tax Abatement
None found
Year BuiltUnitsRGB RegistrationTax Abatement
Before 1974 >6 units Registered None

Full Building Data for 240 Central Park South

Housing Maintenance Code Complaints

This table shows complaints to 311 related to potential NYC Housing Maintenance Code (HMC) for 240 Central Park South. These complaints are related to conditions such as lack of heat, hot water, mold, pests, and other habitability issues. Class B and C violations are the most serious and may indicate significant problems with building maintenance or safety.

Date ReceivedSttatus DateCategoryTypeStatus
2025-06-182025-06-22Heat/hot Water-Apartment OnlyImmediate EmergencyCLOSE
2025-01-162025-01-21Heat/hot Water-Apartment OnlyEmergencyCLOSE
2025-01-082025-01-13Heat/hot Water-Entire BuildingEmergencyCLOSE
2024-12-252024-12-27Plumbing-Water SupplyImmediate EmergencyCLOSE
2024-08-292024-09-06Door/window-Window FrameNon EmergencyCLOSE

Housing Maintenance Code Violations

This table shows violations of the NYC Housing Maintenance Code (HMC) issued by HPD for 240 Central Park South. These violations are related to conditions such as lack of heat, hot water, mold, pests, and other habitability issues. Class B and C violations are the most serious and may indicate significant problems with building maintenance or safety.

Inspection DateClassStatusStatus DateApartmentNOV DescriptionCertified Date
2024-09-04BOpenNone6H§ 27-2005 HMC: REFIT WINDOW SASH AT SOUTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 6H, 6th STORY, 4th APARTMENT FROM EAST AT SOUTHNone
2024-09-04BOpenNone6H§ 27-2005 HMC: REFIT WINDOW SASH AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6H, 6th STORY, 4th APARTMENT FROM EAST AT SOUTHNone
2024-08-26BOpenNone6H§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SOUTHEAST AND SOUTHWEST SASH PANELS AT CASEMENT WINDOW AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 6H, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTHNone
2024-08-26BOpenNone6H§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SOUTHEAST AND SOUTHWEST SASH PANELS AT SOUTHEAST CASEMENT WINDOW AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6H, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTHNone
2024-08-26BOpenNone6H§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SASHES AT SOUTHEAST AND SOUTHWEST PANELS AT SOUTHWEST CASEMENT WINDOW IN THE 1st ROOM FROM EAST LOCATED AT APT 6H, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTHNone

311 Service Requests

Service requests made to 311 for 240 Central Park South. Data from NYC 311.

Created DateTypeDescriptionStatusAgencyResolution
2025-01-16 10:12HEAT/HOT WATERAPARTMENT ONLYClosedHPD
2025-01-08 18:53HEAT/HOT WATERENTIRE BUILDINGClosedHPD
2024-12-25 14:05PLUMBINGWATER SUPPLYClosedHPD
2024-10-19 18:24Food EstablishmentLetter GradingClosedDOHMH
2024-08-29 15:41DOOR/WINDOWWINDOW FRAMEClosedHPD

DOB Complaints

Department of Buildings complaints regarding 240 Central Park South.

Complaint #FiledStatusCategoryInspection DateDisposition
16751392024-08-15ACTIVELocal Law 188/17 Compliance Inspections – Active Jobs
16656922024-04-18CLOSEDElevator: Multiple Devices on Property2024-06-07No Violation Warranted For Complaint At Time Of Inspection (2024-06-10)
16460772023-08-21CLOSEDLocal Law 188/17 Compliance Inspections – Active Jobs2023-08-24No Violation Warranted For Complaint At Time Of Inspection (2023-08-24)
16133122022-07-05CLOSEDWork Without a Permit – Occupied Multiple Dwelling2022-07-05No Violation Warranted For Complaint At Time Of Inspection (2022-07-05)
16133132022-07-05CLOSEDWork Without a Permit – Occupied Multiple Dwelling2022-07-05No Violation Warranted For Complaint At Time Of Inspection (2022-07-05)

DOB Violations

Department of Buildings violations regarding 240 Central Park South.

Date IssuedCategoryDescriptionStatusComments
2020-10-22V*-DOB VIOLATION - ResolvedPPN203 AOC SUB 011521 BY NOUVEAU ELEV GEORGE ZIUGZDA CERT#3660012021-02-11
2020-10-22V*-DOB VIOLATION - ResolvedPPN203 AOC SUB 05/14/2021 BY NOUVEAU ELEVATOR CERT 366001 GEORGE ZIUGZDA2021-06-02
2020-10-22V*-DOB VIOLATION - ResolvedPPN203 AOC SUB 05/14/2021 BY NOUVEAU ELEVATOR CERT 366001 GEORGE ZIUGZDA2021-06-02
2020-10-22V*-DOB VIOLATION - ResolvedDISMISSED BASED ON SUBSEQUENT REPORT SHOWING DEFECTS CORRECTED2022-12-16
2020-10-09V*-DOB VIOLATION - DISMISSEDBOROUGH COMMISSIONER HAS ISSUED A NOTICE OF IMMEDIATE STOP WORK ORDER DUE TO APPLICANT WITHDRAW OF APPLICATION # 104800280DISMISSED BASED ON PERMIT BEING SUPERSEDED BY NEW APPLICANT JOB # 1048002802021-09-09

Indoor Environment Complaints (DOHMH)

The table below shows indoor environment complaints received regarding the conditions at 240 Central Park South. The information includes the date, type, description, and status of each complaint. The data is sourced from DOHMH/311.

Bedbug Infestations

The table below shows the bedbug reports filed by the landlord for 240 Central Park South. The information includes the file date, infested units, eradicated units, re-infested units, filing start date, and filing end date. The data is sourced from DOHMH. Landlords are required to file these reports; missing data may indicate non-compliance.

File DateInfested UnitsEradicated UnitsRe-infested UnitsFiling Start DateFiling End Date
2025-02-170002023-11-012024-10-31
2024-12-180002023-11-012024-10-31
2023-12-060002022-11-012023-10-31
2023-12-060002022-11-012023-10-31
2023-11-280002021-11-012022-10-31

Rodent Inspections

Recent rodent inspection results for 240 Central Park South. Data from NYC DOHMH.

DateTypeResult
2020-11-12CompliancePassed
2020-09-15InitialRat Activity
2020-08-27InitialPassed
2016-11-02InitialPassed
2014-07-22InitialPassed

HPD Litigation Explanation

The table below shows the HPD litigation records for 240 Central Park South. The information includes the open date, case type, status, judgement, penalty and whether harassment was found. The data is sourced from HPD.

Source: HPD
Open DateCase TypeStatusJudgementPenaltyHarassment found

OATH Cases Explanation

The table below shows the Office of Administrative Trials and Hearings cases for 240 Central Park South. The information includes the date, agency, respondent, charge, result, penalty, and status. The data is sourced from OATH.

Source: Office of Administrative Trials and Hearings (OATH)
DateAgencyRespondentChargeResultPenaltyStatus

ECB Violations

Environmental Control Board violations for 240 Central Park South. Data from ECB.

DateNumberRespondentDescriptionStatusPenaltyBalance Due
2021-05-1035550948ZPRATT CONSTRUCTION & RESWORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. AT TIME OF INSPECTION ON AN ACTIVE JOBSITE OF 28 STY BLDG OBSERVED C-HOOK SUSPENDED SCAFFOLD INSTALLED AT EXP#3 AT ROOF LEVEL &RESOLVE0.00.0
2021-05-1035550947RPRATT CONSTRUCTION & RESFAILURE TO PROVIDE APPROVED PLANS AT SITE. AT TIME OF INSPECTION ON ANACTIVE JOBSITE OF AN OCCUPIED RESIDENTIAL 28 STY BLDG,OBSERVED WORK INPROGRESS W/WORKERS AT SETBACK OF 11 FLOOR & A C-HOOK SUSPENDED SCAFFOLRESOLVE0.00.0
2021-05-1035556700MINTERSYSTEM INSTALLATIONWORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPPROVED AMENDMENTS. AT TIME OF INSPECTION ON AN ACTIVE JOBSITE,OBSERVED SIDEWALK SHED INSTALLED AT EXP#1. SIDEWALK SHED IS MISSING CROSS BRACKS-PLRESOLVE0.00.0
2021-05-1035550949KARTUR BUDZINSKIFAILURE TO MAINTAIN/DISPLAY ON SITE DRAWINGS/DOCUMENTS REQUIRED BY CHAPTER 33. AT TIME OF INSPECTION ON AN ACTIVE JOBSITE,OBSERVED C-HOOK SUSPENDED SCAFFOLD AT EXP#3. UPON REQUEST FOR C-HOOK DESIGN DRAWING,INSTRESOLVE625.00.0
2021-05-1035550945NCENTRAL PARK SOUTH ASSOCIFAILURE TO POST & DISTRIBUTE NOTICE TO OCCUPANTS OF TENANT PROTECTION PLAN(TPP). AT TIME OF INSPECTION ON AN ACTIVE JOBSITE OF AN OCCUPIED RESIDENTIAL 28 STY BLDG OBSERVED WORK IN PROGRESS W/C-HOOK SUSPENDED SCRESOLVE1250.00.0

Alternative Enforcement Program (AEP) Explanation

The table below shows the Alternative Enforcement Program (AEP) records for 240 Central Park South. The information includes the start date, start violations, discharge date, and status. The data is sourced from HPD.

Source: Department of Housing Preservation and Development (HPD)
Start DateStart ViolationsDischarge DateStatus

Vacate Orders Explanation

The table below shows the vacate orders for 240 Central Park South. The information includes the effective date, rescinded date, reason, type, and units. The data is sourced from DOB.

Source: Department of Buildings (DOB)
Effective DateRescinded DateReasonTypeUnits

Work Orders Explanation

The table below shows the work orders for 240 Central Park South. The information includes the date created, type, description, and charge. The data is sourced from HPD.

Source: Department of Housing Preservation and Development (HPD)
Date CreatedTypeDescriptionCharge

Liens Explanation

The table below shows tax and water liens for 240 Central Park South. Information includes tax class, month, water only flag, amount, and cycle. Data is sourced from NYC Department of Finance.

Source: NYC Department of Finance
Tax ClassMonthWater OnlyAmountCycle

Case NumberDateTypeStatusDetails

Sales Records

Sales transactions for 240 Central Park South. Data includes sale date, price, buyer, and seller.

DatePriceBuyerSeller

Asbestos Records

Asbestos abatement filings and records for 240 Central Park South. Data includes filing date, type, and status.

Start DateEnd DateStatusProcedureFloor

Fire Violations

Violations issued by the Fire Department for this property.

Violation NumberDateDescriptionStatus

Fire Inspections

Fire Department inspection records for this property.

Fire Certificates

Fire safety certificates for this property.

TypeIssue DateExpiration

Water Connections

Water connection permits and records for 240 Central Park South. Data includes connection type, date, and status.

MaterialRecord Type

Elevator Permits

Elevator permit records for 240 Central Park South. Data includes permit type, issue date, and status.

TypeIssue DateStatus

Landmark Violations

Landmark preservation violations for 240 Central Park South. Data includes violation date, type, and status.

DateTypeStatus

Planning Projects

City Planning (ZAP) project applications for this building. Data includes project ID, status, borough, and lot/block information.

Project IDStatusBoroughBlockLot
Sign in to view this data.

Building Permits

Department of Buildings issued building permits for this property. This includes permits for construction, alteration, and demolition work. Data includes permit type, job number, status, and issue date.

Permit TypeJob NumberStatusIssue Date

Electrical Permits

Department of Buildings issued electrical permits for this property. This includes permits for electrical work, installations, and modifications. Data includes permit type, job number, status, and issue date.

Permit TypeJob NumberStatusIssue Date

How 240 Central Park South Compares

Loading...

Loading comparison data...

Compare with buildings in Midtown:

0

Comparable Buildings

0

Better Rated

0

Worse Rated

Preview of building report data and features

Unlock Complete Building History

Get access to comprehensive violation records, court cases, landlord portfolios, and detailed maintenance history for this building and thousands of others.

Full violation history
Landlord portfolios
Court case records
PDF/Excel reports
Sign Up for Free Access
No credit card required • Instant access

Nearby Buildings