You need to enable JavaScript to use this site.159 Eastern Parkway, Brooklyn Report | Augrented NYC Apartment Ratings & Reviews
Building and Landlord Data Analysis Report

159 Eastern Parkway, Brooklyn, NY 11238

3
DOB Complaints
118
311 Housing Calls
137
Housing Violations
0
Permits

Risk Assessment

21
High Risk

This building is in the riskiest 10% of buildings in NYC with significant maintenance issues.

Our AI predicts there is a 21% chance of no major maintenance issues.
Augrented Insights Report for 159 Eastern Parkway

158 Eastern Parkway is a 72-unit, 6-story residential building located in Prospect Heights, built in 1927 and currently owned by Larry Malitlky. The building has experienced recurring maintenance challenges in recent years, with the most recent issues concentrated around plumbing and unsanitary conditions. In June 2025, multiple complaints regarding sink plumbing problems and pest infestations were filed, though inspections were unable to be completed. These followed several months of heat and hot water complaints between March 2025 and May 2025, though these services were confirmed to be restored during inspections.

The building has documented bedbug infestations in 2022 and 2024, though recent rodent inspections in 2025 have passed. A comprehensive review of the building's history reveals persistent maintenance and safety concerns. In late 2024, violations were issued for inadequate heat and hot water supply in apartment 5L, along with pest infestations in apartments 6B and 6K. While these violations were certified as corrected in early 2025, a roof leak issue in apartment 6L remains open as of August 2024.

Previous maintenance history shows recurring pest problems, including multiple instances of mice and roach infestations in various units between 2019 and 2024. The building has also received violations related to building systems and safety equipment, including elevator issues in 2020, though these were ultimately resolved. A detailed inspection of the building's elevator systems in 2020 resulted in violations related to door checks and safety equipment, which were resolved with a penalty of $625. The property has maintained compliance with recent local law requirements, with the most recent inspection in early 2025 finding no violations.

Last updated: July 27, 2025
This report is created with AI and based on the most recent 10 data items in each category. Full reports with 50+ data points are available to subscribers.

Download Full Report for 159 Eastern Parkway

Sign up to download the full building report in PDF or Excel format

Sign Up for Free

159 Eastern Parkway Building Overview

Renter Risk Rating

This building's risk level is typical for buildings in Prospect Heights.

Building Characteristics

Total units 72
Year built 1927
Total area 52140 sq ft
Floors 6
Tax Abatements None
Building Class NEW LAW TENEMENT
Preview of building report data and features

Unlock Complete Building History

Get access to comprehensive violation records, court cases, landlord portfolios, and detailed maintenance history for this building and thousands of others.

Full violation history
Landlord portfolios
Court case records
PDF/Excel reports
Sign Up for Free Access
No credit card required • Instant access

Key Building Statistics

3
DOB Complaints
Complaints filed with the Department of Buildings in the last 7 years.
137
Housing Violations
Class B & C housing maintenance code violations.
118
311 Housing Calls
Housing-related 311 service requests in the last 7 years.
6
Work Orders
Repair orders issued by city agencies.
2
ECB Violations
Environmental Control Board violations on record.
1
Evictions
Evictions executed by city marshalls.
5
Rodent Inspections
Rodent inspections conducted by DOHMH.
0
Building Permits
Permits issued by DOB in the last 7 years.

Included Addresses

  • 386 Lincoln Pl, New York, NY 11238
  • 157 Eastern Pkwy, New York, NY 11238

Map and Aerial View of 159 Eastern Parkway

Street Map View
Loading map...

Loading street map...

Satellite View
Loading satellite view...

Loading satellite view...

Reviews of 159 Eastern Parkway

See what current and past tenants have to say

No reviews yet

Be the first to share your experience living at this property. Your review helps future tenants make informed decisions.

Rate your experience Share honest feedback Help other tenants

Share Your Experience

Help future tenants by leaving an honest review of this property

Login Required

You must be logged in to leave a review. Join our community and share your experience!

Login to Continue
Don't have an account? Sign up here

159 Eastern Parkway Landlord Information

HPD Registration Contacts

Contact data is from NYC HPD building registration.

RoleNameAddress

Landlord Portfolio

Other NYC buildings registered to this landlord.

AddressUnitsCode ViolationsRisk Rating

Landlord Court Records

NYC housing court and civil court records. Name matching only; verify parties are actually the owners by reviewing the case files!

159 Eastern Parkway Rent Control Status

Year Built
Built before 1974
Units
More than 6 units
RGB Registration
Registered
Tax Abatement
None found
Year BuiltUnitsRGB RegistrationTax Abatement
Before 1974 >6 units Registered None

Full Building Data for 159 Eastern Parkway

Housing Maintenance Code Complaints

This table shows complaints to 311 related to potential NYC Housing Maintenance Code (HMC) for 159 Eastern Parkway. These complaints are related to conditions such as lack of heat, hot water, mold, pests, and other habitability issues. Class B and C violations are the most serious and may indicate significant problems with building maintenance or safety.

Date ReceivedSttatus DateCategoryTypeStatus
2025-06-232025-06-25General-Signage MissingNon EmergencyCLOSE
2025-06-172025-06-21Unsanitary Condition-PestsEmergencyCLOSE
2025-06-172025-06-21Flooring/stairs-FloorNon EmergencyCLOSE
2025-06-172025-06-21Plumbing-Basin/sinkEmergencyCLOSE
2025-06-172025-06-21Unsanitary Condition-MoldEmergencyCLOSE

Housing Maintenance Code Violations

This table shows violations of the NYC Housing Maintenance Code (HMC) issued by HPD for 159 Eastern Parkway. These violations are related to conditions such as lack of heat, hot water, mold, pests, and other habitability issues. Class B and C violations are the most serious and may indicate significant problems with building maintenance or safety.

Inspection DateClassStatusStatus DateApartmentNOV DescriptionCertified Date
2024-12-22CCloseNone5L§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 5L, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH2025-01-04T00:00:00.000Z
2024-12-22CCloseNone5L§ 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT 5L, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH2025-01-04T00:00:00.000Z
2024-12-22CCloseNoneNone§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR TO BOILER ROOM AT CELLAR2025-01-14T00:00:00.000Z
2024-12-20BCloseNone6B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH2025-02-10T00:00:00.000Z
2024-12-20CCloseNone6BHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH2025-01-23T00:00:00.000Z

311 Service Requests

Service requests made to 311 for 159 Eastern Parkway. Data from NYC 311.

Created DateTypeDescriptionStatusAgencyResolution
2025-06-10 09:25PLUMBINGBASIN/SINKClosedHPD
2025-06-10 09:25PLUMBINGBASIN/SINKClosedHPD
2025-05-28 13:18UNSANITARY CONDITIONPESTSClosedHPD
2025-05-28 13:18UNSANITARY CONDITIONPESTSClosedHPD
2025-05-14 14:41OUTSIDE BUILDINGROOFINGClosedHPD

DOB Complaints

Department of Buildings complaints regarding 159 Eastern Parkway.

Complaint #FiledStatusCategoryInspection DateDisposition
39911062025-01-15CLOSEDLocal Law 188/17 Compliance Inspections – Active Jobs2025-02-20No Violation Warranted For Complaint At Time Of Inspection (2025-02-20)
38325312022-02-20CLOSEDIllegal Hotel Rooms in Residential Buildings2022-03-02No Violation Warranted For Complaint At Time Of Inspection (2022-03-02)
37582282020-07-01CLOSEDElevator: Multiple Devices on Property2020-07-02Oath Summons Prepared And Attempt To Serve Will Be Made (2020-07-02)
37197342019-09-03CLOSEDElevator: Multiple Devices on Property2019-10-28No Violation Warranted For Complaint At Time Of Inspection (2019-10-28)

DOB Violations

Department of Buildings violations regarding 159 Eastern Parkway.

Date IssuedCategoryDescriptionStatusComments
2021-01-22V*-DOB VIOLATION - ResolvedPPN203 AOC SUB 07192022 BY PRECISION ELV CORP KRZYSZTOF OKULEWICZ #4290132022-08-04
2020-01-23V*-DOB VIOLATION - ResolvedPPN203 AOC SUB ON 10/20/2020 BY:PRECISION IGOR MARCHENKO, CERT #4290082020-12-01
2020-01-23V*-DOB VIOLATION - ResolvedPPN203 AOC SUB ON 10/21/2020 BY:PRECISION IGOR MARCHENKO,CERT #4290082020-12-03
2019-01-14V*-DOB VIOLATION - ResolvedPPN203 AOC SUB ON 10/20/2020 BY:PRECISION SEMYON BALISTER, CERT #4290072020-12-01

Indoor Environment Complaints (DOHMH)

The table below shows indoor environment complaints received regarding the conditions at 159 Eastern Parkway. The information includes the date, type, description, and status of each complaint. The data is sourced from DOHMH/311.

Bedbug Infestations

The table below shows the bedbug reports filed by the landlord for 159 Eastern Parkway. The information includes the file date, infested units, eradicated units, re-infested units, filing start date, and filing end date. The data is sourced from DOHMH. Landlords are required to file these reports; missing data may indicate non-compliance.

File DateInfested UnitsEradicated UnitsRe-infested UnitsFiling Start DateFiling End Date
2024-12-301102023-11-012024-10-31
2023-12-270002022-11-012023-10-31
2022-12-121102021-11-012022-10-31
2021-12-270002020-11-012021-10-31
2020-12-291102019-11-012020-10-31

Rodent Inspections

Recent rodent inspection results for 159 Eastern Parkway. Data from NYC DOHMH.

DateTypeResult
2025-06-30InitialPassed
2024-05-23InitialPassed
2024-03-07CompliancePassed
2024-01-10InitialRat Activity
2023-06-02InitialPassed

HPD Litigation Explanation

The table below shows the HPD litigation records for 159 Eastern Parkway. The information includes the open date, case type, status, judgement, penalty and whether harassment was found. The data is sourced from HPD.

Source: HPD
Open DateCase TypeStatusJudgementPenaltyHarassment found

OATH Cases Explanation

The table below shows the Office of Administrative Trials and Hearings cases for 159 Eastern Parkway. The information includes the date, agency, respondent, charge, result, penalty, and status. The data is sourced from OATH.

Source: Office of Administrative Trials and Hearings (OATH)
DateAgencyRespondentChargeResultPenaltyStatus

ECB Violations

Environmental Control Board violations for 159 Eastern Parkway. Data from ECB.

DateNumberRespondentDescriptionStatusPenaltyBalance Due
2020-07-0239024884YJS 159 LLCREPLACE WORN DOOR CHECKS WHERE NEEDED. ADJUST DOOR CHECKS WHERE NEEDED. ADJUST GAPS AT TOP OF EACH BRAKE PAD. GUARD MR VENTILATION. EXPIRED FIRE EXTINGUISHER. PROVIDE KEYS FOR ENTRY TO ROOF/OVERHEADRESOLVE625.00.0
2018-05-1538263141PJS 159 LLC14M11,40I10,41I10,70M07.56Y13,59Y11,99M07,16J01,57BB11,40M07,59E01.42L10,03I10-14M)REPLACE. 40I)HOLE EXPOSING OUTSIDE. 41I)REPAIR. 70M)LADDER. 56Y)SEAL LEAKS. 59Y)OIL SOAKED PADS, REPLACE. 99M)TAG MISSING. 16J)RESOLVE0.00.0

Alternative Enforcement Program (AEP) Explanation

The table below shows the Alternative Enforcement Program (AEP) records for 159 Eastern Parkway. The information includes the start date, start violations, discharge date, and status. The data is sourced from HPD.

Source: Department of Housing Preservation and Development (HPD)
Start DateStart ViolationsDischarge DateStatus

Vacate Orders Explanation

The table below shows the vacate orders for 159 Eastern Parkway. The information includes the effective date, rescinded date, reason, type, and units. The data is sourced from DOB.

Source: Department of Buildings (DOB)
Effective DateRescinded DateReasonTypeUnits

Work Orders Explanation

The table below shows the work orders for 159 Eastern Parkway. The information includes the date created, type, description, and charge. The data is sourced from HPD.

Source: Department of Housing Preservation and Development (HPD)
Date CreatedTypeDescriptionCharge

Liens Explanation

The table below shows tax and water liens for 159 Eastern Parkway. Information includes tax class, month, water only flag, amount, and cycle. Data is sourced from NYC Department of Finance.

Source: NYC Department of Finance
Tax ClassMonthWater OnlyAmountCycle

Case NumberDateTypeStatusDetails

Sales Records

Sales transactions for 159 Eastern Parkway. Data includes sale date, price, buyer, and seller.

DatePriceBuyerSeller

Asbestos Records

Asbestos abatement filings and records for 159 Eastern Parkway. Data includes filing date, type, and status.

Start DateEnd DateStatusProcedureFloor

Fire Violations

Violations issued by the Fire Department for this property.

Violation NumberDateDescriptionStatus

Fire Inspections

Fire Department inspection records for this property.

Fire Certificates

Fire safety certificates for this property.

TypeIssue DateExpiration

Water Connections

Water connection permits and records for 159 Eastern Parkway. Data includes connection type, date, and status.

MaterialRecord Type

Elevator Permits

Elevator permit records for 159 Eastern Parkway. Data includes permit type, issue date, and status.

TypeIssue DateStatus

Landmark Violations

Landmark preservation violations for 159 Eastern Parkway. Data includes violation date, type, and status.

DateTypeStatus

Planning Projects

City Planning (ZAP) project applications for this building. Data includes project ID, status, borough, and lot/block information.

Project IDStatusBoroughBlockLot
Sign in to view this data.

Building Permits

Department of Buildings issued building permits for this property. This includes permits for construction, alteration, and demolition work. Data includes permit type, job number, status, and issue date.

Permit TypeJob NumberStatusIssue Date

Electrical Permits

Department of Buildings issued electrical permits for this property. This includes permits for electrical work, installations, and modifications. Data includes permit type, job number, status, and issue date.

Permit TypeJob NumberStatusIssue Date

How 159 Eastern Parkway Compares

Loading...

Loading comparison data...

Compare with buildings in Prospect Heights:

0

Comparable Buildings

0

Better Rated

0

Worse Rated

Preview of building report data and features

Unlock Complete Building History

Get access to comprehensive violation records, court cases, landlord portfolios, and detailed maintenance history for this building and thousands of others.

Full violation history
Landlord portfolios
Court case records
PDF/Excel reports
Sign Up for Free Access
No credit card required • Instant access

Nearby Buildings