You need to enable JavaScript to use this site.212 8th Avenue, Manhattan Report | Augrented NYC Apartment Ratings & Reviews
Building and Landlord Data Analysis Report

212 8th Avenue, Manhattan, NY 10011

1
DOB Complaints
16
311 Housing Calls
11
Housing Violations
0
Permits

Risk Assessment

94
Low Risk

This building shows minimal signs of maintenance issues based on our analysis.

Our AI predicts there is a 94% chance of no major maintenance issues.
Augrented Insights Report for 212 8th Avenue

212 8th Avenue is a 3-story, 17-unit residential building located in Chelsea, built in 1900 and currently owned by Mark Levine. The property has experienced significant maintenance issues in 2025, with multiple open complaints filed in May 2025 regarding a refrigerator problem, plumbing issues with a sink, and a door problem – all of which remain unresolved. There were several serious heat and hot water complaints in March and April 2025 that resulted in violations, though some were closed due to lack of access for inspection. A heavy water leak complaint from March 2025 is also still open.

The building has a documented history of various maintenance and safety concerns. In 2023, Apartment 2W was the subject of multiple violations, including mold issues in the bathroom, water leak problems in the kitchen, and deficiencies with carbon monoxide and smoke detectors. The apartment also had problems with defective plastered surfaces requiring repair. More recently, in December 2024, multiple Environmental Control Board violations were issued relating to construction work being performed without proper permits, including electrical and plumbing work, installation of new washer/dryer combos, and concerns about a loose and detached steel ladder for roof access.

There are also hazardous conditions noted in common hallways with construction materials and debris. However, the building has maintained a pest-free status recently, with no bedbug reports filed since 2022 and passed rodent inspections in 2023 and 2024, though there were some rat activity reports in 2021-2022. The property has undergone several inspections and received various violations over the past few years, with most issues being addressed through repairs or corrections. The recent complaints from May 2025 are particularly concerning due to their ongoing status. While there have been no bedbug infestations reported since late 2022, and rodent control efforts appear to be improving, the building currently shows multiple unresolved maintenance issues as of mid-2025, particularly regarding appliances, plumbing, and door maintenance.

Last updated: July 27, 2025
This report is created with AI and based on the most recent 10 data items in each category. Full reports with 50+ data points are available to subscribers.

Download Full Report for 212 8th Avenue

Sign up to download the full building report in PDF or Excel format

Sign Up for Free

212 8th Avenue Building Overview

Renter Risk Rating

This building is in the riskiest 10% of buildings in Chelsea.

Building Characteristics

Total units 17
Year built 1900
Total area 9891 sq ft
Floors 3
Tax Abatements None
Building Class 2 FAMILY HOUSE
Preview of building report data and features

Unlock Complete Building History

Get access to comprehensive violation records, court cases, landlord portfolios, and detailed maintenance history for this building and thousands of others.

Full violation history
Landlord portfolios
Court case records
PDF/Excel reports
Sign Up for Free Access
No credit card required • Instant access

Key Building Statistics

1
DOB Complaints
Complaints filed with the Department of Buildings in the last 7 years.
11
Housing Violations
Class B & C housing maintenance code violations.
16
311 Housing Calls
Housing-related 311 service requests in the last 7 years.
0
Work Orders
Repair orders issued by city agencies.
0
ECB Violations
Environmental Control Board violations on record.
0
Evictions
Evictions executed by city marshalls.
14
Rodent Inspections
Rodent inspections conducted by DOHMH.
0
Building Permits
Permits issued by DOB in the last 7 years.

Included Addresses

  • 212 8th Ave, New York, NY 10011
  • 270 West 21st St, New York, NY 10011
  • 264 West 21st St, New York, NY 10011
  • 266 West 21st St, New York, NY 10011
  • 268 West 21st St, New York, NY 10011
  • 212 8th Ave, New York, NY 10011
  • 270 West 21st St, New York, NY 10011
  • 264 West 21st St, New York, NY 10011
  • 266 West 21st St, New York, NY 10011
  • 268 West 21st St, New York, NY 10011

Map and Aerial View of 212 8th Avenue

Street Map View
Loading map...

Loading street map...

Satellite View
Loading satellite view...

Loading satellite view...

Reviews of 212 8th Avenue

See what current and past tenants have to say

No reviews yet

Be the first to share your experience living at this property. Your review helps future tenants make informed decisions.

Rate your experience Share honest feedback Help other tenants

Share Your Experience

Help future tenants by leaving an honest review of this property

Login Required

You must be logged in to leave a review. Join our community and share your experience!

Login to Continue
Don't have an account? Sign up here

212 8th Avenue Landlord Information

HPD Registration Contacts

Contact data is from NYC HPD building registration.

RoleNameAddress

Landlord Portfolio

Other NYC buildings registered to this landlord.

AddressUnitsCode ViolationsRisk Rating

Landlord Court Records

NYC housing court and civil court records. Name matching only; verify parties are actually the owners by reviewing the case files!

212 8th Avenue Rent Control Status

Year Built
Built before 1974
Units
More than 6 units
RGB Registration
Registered
Tax Abatement
None found
Year BuiltUnitsRGB RegistrationTax Abatement
Before 1974 >6 units Registered None

Full Building Data for 212 8th Avenue

Housing Maintenance Code Complaints

This table shows complaints to 311 related to potential NYC Housing Maintenance Code (HMC) for 212 8th Avenue. These complaints are related to conditions such as lack of heat, hot water, mold, pests, and other habitability issues. Class B and C violations are the most serious and may indicate significant problems with building maintenance or safety.

Date ReceivedSttatus DateCategoryTypeStatus
2025-05-132025-05-13Appliance-RefrigeratorNon EmergencyOPEN
2025-05-132025-05-13Door/window-DoorEmergencyOPEN
2025-05-132025-05-13Plumbing-Basin/sinkEmergencyOPEN
2025-04-072025-04-10Heat/hot Water-Entire BuildingEmergencyCLOSE
2025-03-192025-04-08Plumbing-Water SupplyNon EmergencyCLOSE

Housing Maintenance Code Violations

This table shows violations of the NYC Housing Maintenance Code (HMC) issued by HPD for 212 8th Avenue. These violations are related to conditions such as lack of heat, hot water, mold, pests, and other habitability issues. Class B and C violations are the most serious and may indicate significant problems with building maintenance or safety.

Inspection DateClassStatusStatus DateApartmentNOV DescriptionCertified Date
2023-09-18CCloseNone2W§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 2W, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST2023-09-28T00:00:00.000Z
2023-06-17CCloseNone2W§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX.30 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 2W, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTNone
2023-04-26BCloseNone2W§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2W, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST2023-05-04T00:00:00.000Z
2023-04-26ACloseNone2W§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROXIMATELY 7 SQ. FT. IN THE BATHROOM LOCATED AT APT 2W, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST2023-08-09T00:00:00.000Z
2023-04-26CCloseNone2W§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 2W, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST2023-05-03T00:00:00.000Z

311 Service Requests

Service requests made to 311 for 212 8th Avenue. Data from NYC 311.

Created DateTypeDescriptionStatusAgencyResolution
2025-05-13 15:58DOOR/WINDOWDOOROpenHPD
2025-05-13 15:58APPLIANCEREFRIGERATOROpenHPD
2025-05-13 15:58PLUMBINGBASIN/SINKOpenHPD
2025-04-07 14:07HEAT/HOT WATERENTIRE BUILDINGClosedHPD
2025-04-03 09:20HEAT/HOT WATERENTIRE BUILDINGClosedHPD

DOB Complaints

Department of Buildings complaints regarding 212 8th Avenue.

Complaint #FiledStatusCategoryInspection DateDisposition
14902092018-09-19CLOSEDStorefront or Business Sign/Awning/Marquee/Canopy – ILLEGAL2018-11-30No Violation Warranted For Complaint At Time Of Inspection (2018-12-14)

DOB Violations

Department of Buildings violations regarding 212 8th Avenue.

Date IssuedCategoryDescriptionStatusComments

Indoor Environment Complaints (DOHMH)

The table below shows indoor environment complaints received regarding the conditions at 212 8th Avenue. The information includes the date, type, description, and status of each complaint. The data is sourced from DOHMH/311.

Bedbug Infestations

The table below shows the bedbug reports filed by the landlord for 212 8th Avenue. The information includes the file date, infested units, eradicated units, re-infested units, filing start date, and filing end date. The data is sourced from DOHMH. Landlords are required to file these reports; missing data may indicate non-compliance.

File DateInfested UnitsEradicated UnitsRe-infested UnitsFiling Start DateFiling End Date
2025-04-020002023-11-012024-10-31
2024-12-040002023-11-012024-10-31
2023-12-200002022-11-012023-10-31
2023-12-190002022-11-012023-10-31
2023-12-190002022-11-012023-10-31

Rodent Inspections

Recent rodent inspection results for 212 8th Avenue. Data from NYC DOHMH.

DateTypeResult
2025-06-25InitialPassed
2024-07-16InitialPassed
2024-05-03BAITBait applied
2024-04-16ComplianceRat Activity
2024-03-19InitialRat Activity

HPD Litigation Explanation

The table below shows the HPD litigation records for 212 8th Avenue. The information includes the open date, case type, status, judgement, penalty and whether harassment was found. The data is sourced from HPD.

Source: HPD
Open DateCase TypeStatusJudgementPenaltyHarassment found

OATH Cases Explanation

The table below shows the Office of Administrative Trials and Hearings cases for 212 8th Avenue. The information includes the date, agency, respondent, charge, result, penalty, and status. The data is sourced from OATH.

Source: Office of Administrative Trials and Hearings (OATH)
DateAgencyRespondentChargeResultPenaltyStatus

ECB Violations

Environmental Control Board violations for 212 8th Avenue. Data from ECB.

DateNumberRespondentDescriptionStatusPenaltyBalance Due
2024-12-1839133352XREDIRECTING LIC INCUPON INSPECTION THROUGHOUT THE 4-STORY BLDG., I OBSERVED THE COMMON HALLWAYS CURRENTLY HAVE MISCELLANEOUS CONSTRUCTION MATERIALS/TOOLS/DUST/DEBRIS. CREATING A HAZARD TO TENANTS AND VIOLATION OF NON-COMPLIANCE TACTIVE5000.05000.0
2024-12-1839133346JREDIRECTING LIC INCUPON INSPECTION THROUGHOUT THE 4-STORY BLDG., I OBSERVED THE COMMON HALLWAYS CURRENTLY HAVE MISCELLANEOUS CONSTRUCTION MATERIALS/TOOLS/DUST/DEBRIS. CREATING A HAZARD TO TENANTS AND VIOLATION OF NON-COMPLIANCE TACTIVE5000.05000.0
2024-12-1839133351YREDIRECTING LIC INCUPON INSPECTION THROUGHOUT THE 4-STORY BLDG., I OBSERVED THE COMMON HALLWAYS CURRENTLY HAVE MISCELLANEOUS CONSTRUCTION MATERIALS/TOOLS/DUST/DEBRIS. CREATING A HAZARD TO TENANTS AND VIOLATION OF NON-COMPLIANCE TRESOLVE5000.05000.0
2024-12-1839133426J212 8TH OWNER LLCUPON INSPECTION, I OBSERVED AT 3FLR./APTS. 3W. WORK WITHOUT A PERMIT IS IN PROGRESS. AS PER JOB #M01119295-I1-GC, WHICH STATES "INTERIOR RENOVATION WORK TO UNITS #1E, 2W, 3E, 4W, 1W & COMMON HALLWAY". HOWEVER,RESOLVE3125.03125.0
2024-12-1839133375Z212 8TH OWNER LLCUPON INSPECTION OF THE 4-STORY BLDG. WITH 4-APTS. I OBSERVED AT 4FLR./APT.4. WORK WITHOUT A PERMIT HAS BEEN IN PROGRESS. CURRENTLY, NEW PLUMBING LINES HAVE BEEN INSTALLED FOR A NEW WASHER/DRYER COMBO. AS PER CUACTIVE6250.06250.0

Alternative Enforcement Program (AEP) Explanation

The table below shows the Alternative Enforcement Program (AEP) records for 212 8th Avenue. The information includes the start date, start violations, discharge date, and status. The data is sourced from HPD.

Source: Department of Housing Preservation and Development (HPD)
Start DateStart ViolationsDischarge DateStatus

Vacate Orders Explanation

The table below shows the vacate orders for 212 8th Avenue. The information includes the effective date, rescinded date, reason, type, and units. The data is sourced from DOB.

Source: Department of Buildings (DOB)
Effective DateRescinded DateReasonTypeUnits

Work Orders Explanation

The table below shows the work orders for 212 8th Avenue. The information includes the date created, type, description, and charge. The data is sourced from HPD.

Source: Department of Housing Preservation and Development (HPD)
Date CreatedTypeDescriptionCharge

Liens Explanation

The table below shows tax and water liens for 212 8th Avenue. Information includes tax class, month, water only flag, amount, and cycle. Data is sourced from NYC Department of Finance.

Source: NYC Department of Finance
Tax ClassMonthWater OnlyAmountCycle

Case NumberDateTypeStatusDetails

Sales Records

Sales transactions for 212 8th Avenue. Data includes sale date, price, buyer, and seller.

DatePriceBuyerSeller

Asbestos Records

Asbestos abatement filings and records for 212 8th Avenue. Data includes filing date, type, and status.

Start DateEnd DateStatusProcedureFloor

Fire Violations

Violations issued by the Fire Department for this property.

Violation NumberDateDescriptionStatus

Fire Inspections

Fire Department inspection records for this property.

Fire Certificates

Fire safety certificates for this property.

TypeIssue DateExpiration

Water Connections

Water connection permits and records for 212 8th Avenue. Data includes connection type, date, and status.

MaterialRecord Type

Elevator Permits

Elevator permit records for 212 8th Avenue. Data includes permit type, issue date, and status.

TypeIssue DateStatus

Landmark Violations

Landmark preservation violations for 212 8th Avenue. Data includes violation date, type, and status.

DateTypeStatus

Planning Projects

City Planning (ZAP) project applications for this building. Data includes project ID, status, borough, and lot/block information.

Project IDStatusBoroughBlockLot
Sign in to view this data.

Building Permits

Department of Buildings issued building permits for this property. This includes permits for construction, alteration, and demolition work. Data includes permit type, job number, status, and issue date.

Permit TypeJob NumberStatusIssue Date

Electrical Permits

Department of Buildings issued electrical permits for this property. This includes permits for electrical work, installations, and modifications. Data includes permit type, job number, status, and issue date.

Permit TypeJob NumberStatusIssue Date

How 212 8th Avenue Compares

Loading...

Loading comparison data...

Compare with buildings in Chelsea:

0

Comparable Buildings

0

Better Rated

0

Worse Rated

Preview of building report data and features

Unlock Complete Building History

Get access to comprehensive violation records, court cases, landlord portfolios, and detailed maintenance history for this building and thousands of others.

Full violation history
Landlord portfolios
Court case records
PDF/Excel reports
Sign Up for Free Access
No credit card required • Instant access

Nearby Buildings