You need to enable JavaScript to use this site.1680 3rd Avenue, Manhattan Report | Augrented NYC Apartment Ratings & Reviews
Building and Landlord Data Analysis Report

1680 3rd Avenue, Manhattan, NY 10128

9
DOB Complaints
5
311 Housing Calls
4
Housing Violations
4
Permits

Risk Assessment

97
Low Risk

This building shows minimal signs of maintenance issues based on our analysis.

Our AI predicts there is a 97% chance of no major maintenance issues.
Augrented Insights Report for 1680 3rd Avenue

This 29-story, 280-unit residential building was constructed in 1980 and is currently owned by Steven Trebatch. The property has experienced a series of maintenance and compliance issues over the past several years, with the most recent concerning rodent activity, as evidenced by a September 2023 inspection showing rat presence. The building has had recurring challenges with building systems, including a heat and hot water emergency in 2019, a facility maintenance issue in the pool area in 2020, and a food establishment complaint in 2024 that was addressed by the Department of Health.

Violation records from 2018 show significant work required in apartment 23G regarding lead-based paint hazards and other surface maintenance issues, though these were ultimately certified as corrected. The building's maintenance history demonstrates ongoing efforts to address various compliance requirements, including a recent bedbug report for 2023-2024 showing no infested units, though a previous 2021-2022 report indicated all units were affected at that time. Environmental Control Board violations from 2022-2023 indicate issues with privately owned public space compliance and facade restoration work. The property has undergone multiple inspections for rodent activity, with rat activity noted in recent inspections despite passing inspections in 2021-2022.

The building has maintained active compliance with bedbug reporting requirements, and recent rodent inspections in 2024 and 2025 have passed, suggesting some improvement in pest management. The building's maintenance record shows consistent attention to regulatory requirements, with multiple permits issued between 2018 and 2022 for various work, including elevator maintenance and facade work. While the building has faced recurring maintenance challenges, particularly related to building systems and pest control, recent years have shown some improvement in compliance with health and safety inspections. The most significant recent issues appear to be the rodent activity noted in 2023-2024 inspections, as well as the 2024 food establishment complaint that was addressed.

Last updated: July 27, 2025
This report is created with AI and based on the most recent 10 data items in each category. Full reports with 50+ data points are available to subscribers.

Download Full Report for 1680 3rd Avenue

Sign up to download the full building report in PDF or Excel format

Sign Up for Free

1680 3rd Avenue Building Overview

Renter Risk Rating

This building is in the riskiest 10% of buildings in Upper East Side.

Building Characteristics

Total units 280
Year built 1980
Total area 242157 sq ft
Floors 29
Tax Abatements None
Building Class HEREAFTER ERECTED CLASS A
Preview of building report data and features

Unlock Complete Building History

Get access to comprehensive violation records, court cases, landlord portfolios, and detailed maintenance history for this building and thousands of others.

Full violation history
Landlord portfolios
Court case records
PDF/Excel reports
Sign Up for Free Access
No credit card required • Instant access

Key Building Statistics

9
DOB Complaints
Complaints filed with the Department of Buildings in the last 7 years.
4
Housing Violations
Class B & C housing maintenance code violations.
5
311 Housing Calls
Housing-related 311 service requests in the last 7 years.
0
Work Orders
Repair orders issued by city agencies.
7
ECB Violations
Environmental Control Board violations on record.
1
Evictions
Evictions executed by city marshalls.
6
Rodent Inspections
Rodent inspections conducted by DOHMH.
4
Building Permits
Permits issued by DOB in the last 7 years.

Included Addresses

  • 1680 3rd Ave, New York, NY 10128
  • 1682 3rd Ave, New York, NY 10128
  • 1684 3rd Ave, New York, NY 10128
  • 1686 3rd Ave, New York, NY 10128
  • 1688 3rd Ave, New York, NY 10128
  • 1690 3rd Ave, New York, NY 10128
  • 182 East 95th St, New York, NY 10128
  • 184 East 95th St, New York, NY 10128
  • 186 East 95th St, New York, NY 10128
  • 188 East 95th St, New York, NY 10128

Map and Aerial View of 1680 3rd Avenue

Street Map View
Loading map...

Loading street map...

Satellite View
Loading satellite view...

Loading satellite view...

Reviews of 1680 3rd Avenue

See what current and past tenants have to say

No reviews yet

Be the first to share your experience living at this property. Your review helps future tenants make informed decisions.

Rate your experience Share honest feedback Help other tenants

Share Your Experience

Help future tenants by leaving an honest review of this property

Login Required

You must be logged in to leave a review. Join our community and share your experience!

Login to Continue
Don't have an account? Sign up here

1680 3rd Avenue Landlord Information

HPD Registration Contacts

Contact data is from NYC HPD building registration.

RoleNameAddress

Landlord Portfolio

Other NYC buildings registered to this landlord.

AddressUnitsCode ViolationsRisk Rating

Landlord Court Records

NYC housing court and civil court records. Name matching only; verify parties are actually the owners by reviewing the case files!

1680 3rd Avenue Rent Control Status

Year Built
Built after 1974
Units
More than 6 units
RGB Registration
Registered
Tax Abatement
None found
Year BuiltUnitsRGB RegistrationTax Abatement
After 1974 >6 units Registered None

Full Building Data for 1680 3rd Avenue

Housing Maintenance Code Complaints

This table shows complaints to 311 related to potential NYC Housing Maintenance Code (HMC) for 1680 3rd Avenue. These complaints are related to conditions such as lack of heat, hot water, mold, pests, and other habitability issues. Class B and C violations are the most serious and may indicate significant problems with building maintenance or safety.

Date ReceivedSttatus DateCategoryTypeStatus
2021-09-172021-09-23Flooring/stairs-FloorNon EmergencyCLOSE
2019-05-052019-05-08Heat/hot Water-Entire BuildingEmergencyCLOSE
2018-08-222018-09-07Paint/plaster-WallNon EmergencyCLOSE

Housing Maintenance Code Violations

This table shows violations of the NYC Housing Maintenance Code (HMC) issued by HPD for 1680 3rd Avenue. These violations are related to conditions such as lack of heat, hot water, mold, pests, and other habitability issues. Class B and C violations are the most serious and may indicate significant problems with building maintenance or safety.

Inspection DateClassStatusStatus DateApartmentNOV DescriptionCertified Date
2023-03-15ACloseNoneNone(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.None
2018-11-08CCloseNone23G§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 23G, 23rd STORY, 5th APARTMENT FROM SOUTH AT WESTNone
2018-11-08CCloseNone23G§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL IN THE KITCHENETTE LOCATED AT APT 23G, 23rd STORY, 5th APARTMENT FROM SOUTH AT WESTNone
2018-11-08CCloseNone23G§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE BATHROOM LOCATED AT APT 23G, 23rd STORY, 5th APARTMENT FROM SOUTH AT WESTNone
2018-11-08ACloseNone23G§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 23G, 23rd STORY, 5th APARTMENT FROM SOUTH AT WEST2019-02-20T00:00:00.000Z

311 Service Requests

Service requests made to 311 for 1680 3rd Avenue. Data from NYC 311.

Created DateTypeDescriptionStatusAgencyResolution
2024-01-30 16:14Food EstablishmentRodents/Insects/GarbageClosedDOHMH
2021-09-17 13:47FLOORING/STAIRSFLOORClosedHPD
2020-01-01 19:37Beach/Pool/Sauna ComplaintFacility MaintenanceClosedDOHMH
2019-05-05 20:08HEAT/HOT WATERENTIRE BUILDINGClosedHPD
2018-08-22 08:27PAINT/PLASTERWALLClosedHPD

DOB Complaints

Department of Buildings complaints regarding 1680 3rd Avenue.

Complaint #FiledStatusCategoryInspection DateDisposition
16486032023-09-19CLOSEDElevator: Multiple Devices on Property2023-11-06No Violation Warranted For Complaint At Time Of Inspection (2023-11-06)
15951922022-03-16CLOSEDPrivately Owned Public Space/Non-Compliance2022-03-16Oath Violation Served (2022-03-18)
15410452020-04-15CLOSEDCOVID-19 Executive Order2020-04-15No Violation Warranted For Complaint At Time Of Inspection (2020-04-16)
15048872019-03-20CLOSEDSidewalk Shed/Supported Scaffold/Inadequate/Defect/NONE/NO PMT/NO CERT2019-03-21No Violation Warranted For Complaint At Time Of Inspection (2019-03-21)
15034462019-03-05CLOSEDSidewalk Shed/Supported Scaffold/Inadequate/Defect/NONE/NO PMT/NO CERT2019-03-20No Violation Warranted For Complaint At Time Of Inspection (2019-03-20)

DOB Violations

Department of Buildings violations regarding 1680 3rd Avenue.

Date IssuedCategoryDescriptionStatusComments
2022-06-01V*-DOB VIOLATION - DISMISSEDFAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4000810 PAID INVOICE 906857212022-08-04
2018-09-19V*-DOB VIOLATION - ResolvedPPN203 AOC SUB ON 6/20/19 BY:SCHINDLER ELEV. JAMES NETO, CERT#741212019-07-09
2018-09-19V*-DOB VIOLATION - ResolvedPPN203 AOC SUB ON 6/20/19 BY:SCHINDLER ELEV. JAMES NETO, CERT#741212019-07-09
2018-09-19V*-DOB VIOLATION - ResolvedPPN203 AOC SUB ON 6/20/19 BY:SCHINDLER ELEV. JAMES NETO, CERT#741212019-07-09

Indoor Environment Complaints (DOHMH)

The table below shows indoor environment complaints received regarding the conditions at 1680 3rd Avenue. The information includes the date, type, description, and status of each complaint. The data is sourced from DOHMH/311.

Bedbug Infestations

The table below shows the bedbug reports filed by the landlord for 1680 3rd Avenue. The information includes the file date, infested units, eradicated units, re-infested units, filing start date, and filing end date. The data is sourced from DOHMH. Landlords are required to file these reports; missing data may indicate non-compliance.

File DateInfested UnitsEradicated UnitsRe-infested UnitsFiling Start DateFiling End Date
2024-12-150002023-11-012024-10-31
2023-12-290002022-11-012023-10-31
2023-06-16280002021-11-012022-10-31
2021-12-160002020-11-012021-10-31
2021-02-110002019-11-012020-10-31

Rodent Inspections

Recent rodent inspection results for 1680 3rd Avenue. Data from NYC DOHMH.

DateTypeResult
2025-05-29InitialPassed
2024-11-15CompliancePassed
2024-09-23InitialRat Activity
2023-11-22ComplianceRat Activity
2023-10-04InitialRat Activity

HPD Litigation Explanation

The table below shows the HPD litigation records for 1680 3rd Avenue. The information includes the open date, case type, status, judgement, penalty and whether harassment was found. The data is sourced from HPD.

Source: HPD
Open DateCase TypeStatusJudgementPenaltyHarassment found

OATH Cases Explanation

The table below shows the Office of Administrative Trials and Hearings cases for 1680 3rd Avenue. The information includes the date, agency, respondent, charge, result, penalty, and status. The data is sourced from OATH.

Source: Office of Administrative Trials and Hearings (OATH)
DateAgencyRespondentChargeResultPenaltyStatus

ECB Violations

Environmental Control Board violations for 1680 3rd Avenue. Data from ECB.

DateNumberRespondentDescriptionStatusPenaltyBalance Due
2022-03-1635644304KPM PARTNERSMISC VIOLATION OF CONDITION ON AS OF RIGHT PRIVATELY OWNED SPACE.AS PER ZR 37-74 AND POPS NUMBER M080044 THE LISTED REQUIRED AMENITIES ARE NOT PROVIDED COMPLETELY.MISSING ARTWORK EAST WALL OF ADJACENT BUILDINGRESOLVE625.00.0
2018-10-2635367003YPETER S BROWNSEC. 3310.4 FAILURE TO COMPLY W/SITE SAFETY MONITORING PROGRAM FOR FACADE RESTORATION WORK PURSUANT TO 1RCNY 3310-01. NOTED: AT TIME OF INSPECTION ROOF PROTECTION TO ADJOINING PROPERTY IS NOT IN COMPLIANCE WITHRESOLVE0.00.0
2018-10-2635367004XDNA CONTRACTING LLCWORK DOES NOT CONFORM TO APPROVED PLANS. NOTED: AT TIME OF INSPECTION ROOF PROTECTION TO ADJOINING PROPERTY IS NOT IN COMPLIANCE W/APPROVED SITE SAFETY PLAN. ROOF PROTECTION MISSING WOODEN PLANKS BETWEEN STYROFRESOLVE2500.00.0
2018-10-1835354107XDNA CONTRACTING LLC3310 FAILURE TO HAVE INSPECTION TO START WORK PARTIAL STOP WORK ON FACADE. NOTED AT TIME OF INSPECTION I OBSEVED SITE SAFETY JOB IN PROCESS WITHOUT WRITTEN PERMISSION FROM SITE SAFETY REPRESENTATIVE. REMEDY:RESOLVE625.00.0
2018-10-1835354106YPETER BROWN3310 FAILURE TO PROVIDE INITIAL INSPECTION REPORT. NOTE: AT TIME OF INSPECTION I OBSERVED SITE SAFETY JOB IN PROCESS WITH OUT LITTER STATEING OK TO START WORK. REMEDY: COMPLY WITH CODE PROVIDE INSPECTION.RESOLVE0.00.0

Alternative Enforcement Program (AEP) Explanation

The table below shows the Alternative Enforcement Program (AEP) records for 1680 3rd Avenue. The information includes the start date, start violations, discharge date, and status. The data is sourced from HPD.

Source: Department of Housing Preservation and Development (HPD)
Start DateStart ViolationsDischarge DateStatus

Vacate Orders Explanation

The table below shows the vacate orders for 1680 3rd Avenue. The information includes the effective date, rescinded date, reason, type, and units. The data is sourced from DOB.

Source: Department of Buildings (DOB)
Effective DateRescinded DateReasonTypeUnits

Work Orders Explanation

The table below shows the work orders for 1680 3rd Avenue. The information includes the date created, type, description, and charge. The data is sourced from HPD.

Source: Department of Housing Preservation and Development (HPD)
Date CreatedTypeDescriptionCharge

Liens Explanation

The table below shows tax and water liens for 1680 3rd Avenue. Information includes tax class, month, water only flag, amount, and cycle. Data is sourced from NYC Department of Finance.

Source: NYC Department of Finance
Tax ClassMonthWater OnlyAmountCycle

Case NumberDateTypeStatusDetails

Sales Records

Sales transactions for 1680 3rd Avenue. Data includes sale date, price, buyer, and seller.

DatePriceBuyerSeller

Asbestos Records

Asbestos abatement filings and records for 1680 3rd Avenue. Data includes filing date, type, and status.

Start DateEnd DateStatusProcedureFloor

Fire Violations

Violations issued by the Fire Department for this property.

Violation NumberDateDescriptionStatus

Fire Inspections

Fire Department inspection records for this property.

Fire Certificates

Fire safety certificates for this property.

TypeIssue DateExpiration

Water Connections

Water connection permits and records for 1680 3rd Avenue. Data includes connection type, date, and status.

MaterialRecord Type

Elevator Permits

Elevator permit records for 1680 3rd Avenue. Data includes permit type, issue date, and status.

TypeIssue DateStatus

Landmark Violations

Landmark preservation violations for 1680 3rd Avenue. Data includes violation date, type, and status.

DateTypeStatus

Planning Projects

City Planning (ZAP) project applications for this building. Data includes project ID, status, borough, and lot/block information.

Project IDStatusBoroughBlockLot
Sign in to view this data.

Building Permits

Department of Buildings issued building permits for this property. This includes permits for construction, alteration, and demolition work. Data includes permit type, job number, status, and issue date.

Permit TypeJob NumberStatusIssue Date

Electrical Permits

Department of Buildings issued electrical permits for this property. This includes permits for electrical work, installations, and modifications. Data includes permit type, job number, status, and issue date.

Permit TypeJob NumberStatusIssue Date

How 1680 3rd Avenue Compares

Loading...

Loading comparison data...

Compare with buildings in Upper East Side:

0

Comparable Buildings

0

Better Rated

0

Worse Rated

Preview of building report data and features

Unlock Complete Building History

Get access to comprehensive violation records, court cases, landlord portfolios, and detailed maintenance history for this building and thousands of others.

Full violation history
Landlord portfolios
Court case records
PDF/Excel reports
Sign Up for Free Access
No credit card required • Instant access

Nearby Buildings