You need to enable JavaScript to use this site.75 Post Avenue, Manhattan Report | Augrented NYC Apartment Ratings & Reviews
Building and Landlord Data Analysis Report

75 Post Avenue, Manhattan, NY 10034

3
DOB Complaints
20
311 Housing Calls
4
Housing Violations
0
Permits

Risk Assessment

96
Low Risk

This building shows minimal signs of maintenance issues based on our analysis.

Our AI predicts there is a 96% chance of no major maintenance issues.
Augrented Insights Report for 75 Post Avenue

75 Post Avenue is a 5-story, 20-unit New Law tenement building built in 1940, currently owned by David Nahum. The building has experienced recurring issues with heat and hot water, particularly notable in late 2024 and throughout 2023 when multiple emergency complaints were filed about lack of heating and hot water in the entire building.

These complaints often resulted in inspections where access to units could not be gained to verify the conditions. Other maintenance concerns have included plumbing issues (most recently in July 2023), electrical range problems (most recently in November 2024), and previous reports of unsanitary conditions including pests in mid-2018.

Significant building modifications and compliance issues emerged in late 2023 when three unauthorized SRO units were discovered in the building's cellar adjacent to the boiler room, leading to Environmental Control Board violations regarding illegal occupancy, use of prohibited hardware, and unpermitted construction work. The building's exterior has also faced scrutiny, with violations recorded in 2020 regarding facade disrepair and missing terracotta elements. The property has maintained a clean record regarding bedbug infestations, with no reported cases in the past six years, and recent rodent inspections in early 2025 passed, though an October 2024 inspection noted "rat activity." While the building has passed several recent inspections, including rodent inspections in 2023 and 2024, the persistent heating system issues and the recent unauthorized unit discovery suggest ongoing maintenance challenges.

Last updated: July 27, 2025
This report is created with AI and based on the most recent 10 data items in each category. Full reports with 50+ data points are available to subscribers.

Download Full Report for 75 Post Avenue

Sign up to download the full building report in PDF or Excel format

Sign Up for Free

75 Post Avenue Building Overview

Renter Risk Rating

This building is in the riskiest 10% of buildings in Inwood.

Building Characteristics

Total units 20
Year built 1940
Total area 14490 sq ft
Floors 5
Tax Abatements None
Building Class NEW LAW TENEMENT
Preview of building report data and features

Unlock Complete Building History

Get access to comprehensive violation records, court cases, landlord portfolios, and detailed maintenance history for this building and thousands of others.

Full violation history
Landlord portfolios
Court case records
PDF/Excel reports
Sign Up for Free Access
No credit card required • Instant access

Key Building Statistics

3
DOB Complaints
Complaints filed with the Department of Buildings in the last 7 years.
4
Housing Violations
Class B & C housing maintenance code violations.
20
311 Housing Calls
Housing-related 311 service requests in the last 7 years.
1
Work Orders
Repair orders issued by city agencies.
4
ECB Violations
Environmental Control Board violations on record.
2
Evictions
Evictions executed by city marshalls.
6
Rodent Inspections
Rodent inspections conducted by DOHMH.
0
Building Permits
Permits issued by DOB in the last 7 years.

Map and Aerial View of 75 Post Avenue

Street Map View
Loading map...

Loading street map...

Satellite View
Loading satellite view...

Loading satellite view...

Reviews of 75 Post Avenue

See what current and past tenants have to say

No reviews yet

Be the first to share your experience living at this property. Your review helps future tenants make informed decisions.

Rate your experience Share honest feedback Help other tenants

Share Your Experience

Help future tenants by leaving an honest review of this property

Login Required

You must be logged in to leave a review. Join our community and share your experience!

Login to Continue
Don't have an account? Sign up here

75 Post Avenue Landlord Information

HPD Registration Contacts

Contact data is from NYC HPD building registration.

RoleNameAddress

Landlord Portfolio

Other NYC buildings registered to this landlord.

AddressUnitsCode ViolationsRisk Rating

Landlord Court Records

NYC housing court and civil court records. Name matching only; verify parties are actually the owners by reviewing the case files!

75 Post Avenue Rent Control Status

Year Built
Built before 1974
Units
More than 6 units
RGB Registration
Registered
Tax Abatement
None found
Year BuiltUnitsRGB RegistrationTax Abatement
Before 1974 >6 units Registered None

Full Building Data for 75 Post Avenue

Housing Maintenance Code Complaints

This table shows complaints to 311 related to potential NYC Housing Maintenance Code (HMC) for 75 Post Avenue. These complaints are related to conditions such as lack of heat, hot water, mold, pests, and other habitability issues. Class B and C violations are the most serious and may indicate significant problems with building maintenance or safety.

Date ReceivedSttatus DateCategoryTypeStatus
2024-11-222024-11-28Heat/hot Water-Entire BuildingEmergencyCLOSE
2024-11-042024-11-10Appliance-Electric/gas RangeNon EmergencyCLOSE
2023-12-212023-12-27Heat/hot Water-Entire BuildingEmergencyCLOSE
2023-07-282023-08-02Plumbing-Water SupplyImmediate EmergencyCLOSE
2023-02-092023-02-12Heat/hot Water-Entire BuildingEmergencyCLOSE

Housing Maintenance Code Violations

This table shows violations of the NYC Housing Maintenance Code (HMC) issued by HPD for 75 Post Avenue. These violations are related to conditions such as lack of heat, hot water, mold, pests, and other habitability issues. Class B and C violations are the most serious and may indicate significant problems with building maintenance or safety.

Inspection DateClassStatusStatus DateApartmentNOV DescriptionCertified Date
2018-03-29BCloseNone2§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE ELECTRIC OUTLET COVER PLATE AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST2018-04-23T00:00:00.000Z
2018-03-29BCloseNone2§ 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST2018-04-23T00:00:00.000Z
2017-12-30CCloseNone23§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 23, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH2018-01-05T00:00:00.000Z
2017-12-30CCloseNoneNone§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM AT BASEMENT2018-01-05T00:00:00.000Z

311 Service Requests

Service requests made to 311 for 75 Post Avenue. Data from NYC 311.

Created DateTypeDescriptionStatusAgencyResolution
2024-11-22 06:33HEAT/HOT WATERENTIRE BUILDINGClosedHPD
2024-11-04 10:45APPLIANCEELECTRIC/GAS RANGEClosedHPD
2023-12-21 06:56HEAT/HOT WATERENTIRE BUILDINGClosedHPD
2023-07-28 18:18PLUMBINGWATER SUPPLYClosedHPD
2023-02-09 06:24HEAT/HOT WATERENTIRE BUILDINGClosedHPD

DOB Complaints

Department of Buildings complaints regarding 75 Post Avenue.

Complaint #FiledStatusCategoryInspection DateDisposition
16509422023-10-13CLOSEDConstruction Enforcement Work Order (DOB)2023-10-16No Violation Warranted For Complaint At Time Of Inspection (2023-10-16)
16494102023-09-27CLOSEDIllegal Conversion2024-10-01Vacate Order Fully Rescinded (2024-11-04)
15556342020-10-16CLOSEDFailure to Maintain2020-10-16Oath Violation Served (2020-10-16)

DOB Violations

Department of Buildings violations regarding 75 Post Avenue.

Date IssuedCategoryDescriptionStatusComments
2020-10-16V*-DOB VIOLATION - DISMISSEDPROVIDE APPROXIMATELY 50 LINEAR FEET OF SIDEWALK SHED ALONG EXPOSURE 1 (POST AVENUE)TO PROTECT PEDESTRIANS. ALSO PROVIDE APPROX 25 LINEAR FT OF SIDEWALK SHED AT EXPOSURE 2 (DUE TO HAZARDOUS CONDITION ON ADJACENT BUILDING AT 79 POST AVENUE) TO PROTECT PEDESTRIANSIED #15778 CLOSED ON 10-21-2020.2020-10-26

Indoor Environment Complaints (DOHMH)

The table below shows indoor environment complaints received regarding the conditions at 75 Post Avenue. The information includes the date, type, description, and status of each complaint. The data is sourced from DOHMH/311.

Bedbug Infestations

The table below shows the bedbug reports filed by the landlord for 75 Post Avenue. The information includes the file date, infested units, eradicated units, re-infested units, filing start date, and filing end date. The data is sourced from DOHMH. Landlords are required to file these reports; missing data may indicate non-compliance.

File DateInfested UnitsEradicated UnitsRe-infested UnitsFiling Start DateFiling End Date
2024-12-020002023-11-012024-10-31
2024-11-300002022-11-012023-10-31
2023-12-060002022-11-012023-10-31
2022-12-070002021-11-012022-10-31
2021-12-120002020-11-012021-10-31

Rodent Inspections

Recent rodent inspection results for 75 Post Avenue. Data from NYC DOHMH.

DateTypeResult
2025-03-28InitialPassed
2024-10-22ComplianceRat Activity
2024-08-27InitialRat Activity
2023-08-22InitialPassed
2022-12-01InitialPassed

HPD Litigation Explanation

The table below shows the HPD litigation records for 75 Post Avenue. The information includes the open date, case type, status, judgement, penalty and whether harassment was found. The data is sourced from HPD.

Source: HPD
Open DateCase TypeStatusJudgementPenaltyHarassment found

OATH Cases Explanation

The table below shows the Office of Administrative Trials and Hearings cases for 75 Post Avenue. The information includes the date, agency, respondent, charge, result, penalty, and status. The data is sourced from OATH.

Source: Office of Administrative Trials and Hearings (OATH)
DateAgencyRespondentChargeResultPenaltyStatus

ECB Violations

Environmental Control Board violations for 75 Post Avenue. Data from ECB.

DateNumberRespondentDescriptionStatusPenaltyBalance Due
2023-10-1239096967M75 POST REALTY LLCFAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED (3) SRO UNITS ADJACENT TO BOILER ROOM HAVE DOORS EQUIPPED WITH PROHIBITED LOCKINGRESOLVE1250.00.0
2023-10-1239096964R75 POST REALTY LLCOCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERT OF OCCUPANCY OR BUILDINGS DEPT RECORDS. (3) SRO UNITS PRESENT IN CELLAR OF BUILDING ADJACENT TO BOILER ROOM. SRO'S DO NOT HAVE 2ND MEANS OF EGRESS AND LACK NATURALRESOLVE2500.00.0
2023-10-1239096965Z75 POST REALTY LLCWORK WITHOUT A PERMIT. ALL CONSTRUCTION, PLUMBING, ELECTRICAL WORK COMPLETED TO CREATE (3) SRO UNITS IN CELLAR COMPLETED WITHOUT A PERMIT. NOTE UNAUTHORIZED GAS PIPING FOR STOVE AND (3) PIECE BATHROOM PRESENT WRESOLVE0.00.0
2020-10-1639030491Y75 POST REALTY LLCFAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES. FACADE AT EXPOSURE #1 IN DISREPAIR, DECORATIVE TERRACOTTA ELEMENTS AT ROOF ELEVATION ARE CRACKED AND IN AREAS SECTIONS OF TERRACOTTA ARE COMPLETELY MISSING,RESOLVE2500.00.0

Alternative Enforcement Program (AEP) Explanation

The table below shows the Alternative Enforcement Program (AEP) records for 75 Post Avenue. The information includes the start date, start violations, discharge date, and status. The data is sourced from HPD.

Source: Department of Housing Preservation and Development (HPD)
Start DateStart ViolationsDischarge DateStatus

Vacate Orders Explanation

The table below shows the vacate orders for 75 Post Avenue. The information includes the effective date, rescinded date, reason, type, and units. The data is sourced from DOB.

Source: Department of Buildings (DOB)
Effective DateRescinded DateReasonTypeUnits

Work Orders Explanation

The table below shows the work orders for 75 Post Avenue. The information includes the date created, type, description, and charge. The data is sourced from HPD.

Source: Department of Housing Preservation and Development (HPD)
Date CreatedTypeDescriptionCharge

Liens Explanation

The table below shows tax and water liens for 75 Post Avenue. Information includes tax class, month, water only flag, amount, and cycle. Data is sourced from NYC Department of Finance.

Source: NYC Department of Finance
Tax ClassMonthWater OnlyAmountCycle

Case NumberDateTypeStatusDetails

Sales Records

Sales transactions for 75 Post Avenue. Data includes sale date, price, buyer, and seller.

DatePriceBuyerSeller

Asbestos Records

Asbestos abatement filings and records for 75 Post Avenue. Data includes filing date, type, and status.

Start DateEnd DateStatusProcedureFloor

Fire Violations

Violations issued by the Fire Department for this property.

Violation NumberDateDescriptionStatus

Fire Inspections

Fire Department inspection records for this property.

Fire Certificates

Fire safety certificates for this property.

TypeIssue DateExpiration

Water Connections

Water connection permits and records for 75 Post Avenue. Data includes connection type, date, and status.

MaterialRecord Type

Elevator Permits

Elevator permit records for 75 Post Avenue. Data includes permit type, issue date, and status.

TypeIssue DateStatus

Landmark Violations

Landmark preservation violations for 75 Post Avenue. Data includes violation date, type, and status.

DateTypeStatus

Planning Projects

City Planning (ZAP) project applications for this building. Data includes project ID, status, borough, and lot/block information.

Project IDStatusBoroughBlockLot
Sign in to view this data.

Building Permits

Department of Buildings issued building permits for this property. This includes permits for construction, alteration, and demolition work. Data includes permit type, job number, status, and issue date.

Permit TypeJob NumberStatusIssue Date

Electrical Permits

Department of Buildings issued electrical permits for this property. This includes permits for electrical work, installations, and modifications. Data includes permit type, job number, status, and issue date.

Permit TypeJob NumberStatusIssue Date

How 75 Post Avenue Compares

Loading...

Loading comparison data...

Compare with buildings in Inwood:

0

Comparable Buildings

0

Better Rated

0

Worse Rated

Preview of building report data and features

Unlock Complete Building History

Get access to comprehensive violation records, court cases, landlord portfolios, and detailed maintenance history for this building and thousands of others.

Full violation history
Landlord portfolios
Court case records
PDF/Excel reports
Sign Up for Free Access
No credit card required • Instant access

Nearby Buildings