Building and Landlord Data Analysis Report

2950 Park Avenue, Bronx, NY 10451

14
DOB Complaints
537
311 Housing Calls
304
Housing Violations
0
Permits

Risk Assessment

13
High Risk

This building is in the riskiest 10% of buildings in NYC with significant maintenance issues.

Our AI predicts there is a 13% chance of no major maintenance issues.
Augrented Insights Report for 2950 Park Avenue

2950 Park Avenue, a 7-story Class A building in Melrose owned by Maria Lopez, L.P., has experienced significant maintenance issues in recent years, particularly in 2025. The most pressing current concerns involve multiple open complaints for heavy water leaks (as recent as May 2025), with both emergency and non-emergency housing maintenance code complaints related to water issues continuing to accumulate.

The building has also faced recurring plumbing problems throughout 2025, including water supply issues and bathtub/shower concerns, as well as a construction lead dust complaint that remains in progress as of May 2025. Additionally, there are multiple open violations related to elevator service, with complaints about single device operation and unsafe conditions filed in 2025, along with a potentially serious issue regarding building facade safety that is currently active. The building's history reveals persistent maintenance challenges, including a notable pattern of water-related issues, with several apartments (especially 328) experiencing multiple violations regarding leaks, water supply problems, and various maintenance needs between 2023 and 2024.

Other recorded issues include electrical problems (multiple faulty outlets), bathroom fixture concerns, and several instances of failed housing maintenance inspections where access for evaluation could not be obtained. While the building has shown improvements in pest management with no bedbug infestations reported in the most recent 2024-2025 period (compared to previous years), rodent inspections have shown mixed results, with rat activity noted in January 2023 but passing inspections in 2023 and 2018. The property has multiple active violations related to energy efficiency reporting requirements, including failures to file benchmarking reports and other technical documentation, which may have implications for building operations and maintenance priorities.

Last updated: July 27, 2025
This report is created with AI and based on the most recent 10 data items in each category. Full reports with 50+ data points are available to subscribers.

Download Full Report for 2950 Park Avenue

Sign up to download the full building report in PDF or Excel format

Sign Up for Free

2950 Park AvenueBuilding Overview

Renter Risk Rating

This building is in the riskiest 30% of buildings in Melrose.

Building Characteristics

Total units 216
Year built 1983
Total area 257718 sq ft
Floors 7
Tax Abatements None
Building Class HEREAFTER ERECTED CLASS A
Preview of building report data and features

Unlock Complete Building History

Get access to comprehensive violation records, court cases, landlord portfolios, and detailed maintenance history for this building and thousands of others.

Full violation history
Landlord portfolios
Court case records
PDF/Excel reports
Sign Up for Free Access
No credit card required • Instant access

Key Building Statistics

14
DOB Complaints
Complaints filed with the Department of Buildings in the last 7 years.
304
Housing Violations
Class B & C housing maintenance code violations.
537
311 Housing Calls
Housing-related 311 service requests in the last 7 years.
3
Work Orders
Repair orders issued by city agencies.
1
ECB Violations
Environmental Control Board violations on record.
19
Evictions
Evictions executed by city marshalls.
9
Rodent Inspections
Rodent inspections conducted by DOHMH.
0
Building Permits
Permits issued by DOB in the last 7 years.

Included Addresses

  • 615 Morris Ave, New York, NY 10451
  • 617 Morris Ave, New York, NY 10451
  • 619 Morris Ave, New York, NY 10451
  • 621 Morris Ave, New York, NY 10451
  • 623 Morris Ave, New York, NY 10451
  • 625 Morris Ave, New York, NY 10451
  • 627 Morris Ave, New York, NY 10451
  • 629 Morris Ave, New York, NY 10451
  • 631 Morris Ave, New York, NY 10451
  • 633 Morris Ave, New York, NY 10451
  • 635 Morris Ave, New York, NY 10451
  • 637 Morris Ave, New York, NY 10451
  • 639 Morris Ave, New York, NY 10451
  • 641 Morris Ave, New York, NY 10451
  • 643 Morris Ave, New York, NY 10451
  • 645 Morris Ave, New York, NY 10451
  • 647 Morris Ave, New York, NY 10451
  • 649 Morris Ave, New York, NY 10451
  • 651 Morris Ave, New York, NY 10451
  • 2950 Park Ave, New York, NY 10451
  • 2952 Park Ave, New York, NY 10451
  • 2954 Park Ave, New York, NY 10451
  • 2956 Park Ave, New York, NY 10451
  • 2958 Park Ave, New York, NY 10451
  • 2960 Park Ave, New York, NY 10451

Map and Aerial View of 2950 Park Avenue

Street Map View
Loading map...

Loading street map...

Satellite View
Loading satellite view...

Loading satellite view...

Need Directions?

Click on either map to get detailed directions and explore nearby landmarks, parking options, and accessibility features.

Reviews of 2950 Park Avenue

See what current and past tenants have to say

No reviews yet

Be the first to share your experience living at this property. Your review helps future tenants make informed decisions.

Rate your experience Share honest feedback Help other tenants

Share Your Experience

Help future tenants by leaving an honest review of this property

Login Required

You must be logged in to leave a review. Join our community and share your experience!

Login to Continue
Don't have an account? Sign up here

2950 Park Avenue Landlord Information

HPD Registration Contacts

Contact data is from NYC HPD building registration.

RoleNameAddress

Landlord Portfolio

Other NYC buildings registered to this landlord.

AddressUnitsCode ViolationsRisk Rating

Landlord Court Records

NYC housing court and civil court records. Name matching only; verify parties are actually the owners by reviewing the case files!

2950 Park Avenue Rent Control Status

Year Built
Built after 1974
Units
More than 6 units
RGB Registration
Not registered
Tax Abatement
None found
Year BuiltUnitsRGB RegistrationTax Abatement
After 1974 >6 units Not registered None

Full Building Data for 2950 Park Avenue

Housing Maintenance Code Complaints

This table shows complaints to 311 related to potential NYC Housing Maintenance Code (HMC) for 2950 Park Avenue. These complaints are related to conditions such as lack of heat, hot water, mold, pests, and other habitability issues. Class B and C violations are the most serious and may indicate significant problems with building maintenance or safety.

Date ReceivedSttatus DateCategoryTypeStatus
2025-06-302025-06-30General-CabinetNon EmergencyOPEN
2025-06-152025-06-15Water Leak-Heavy FlowEmergencyOPEN
2025-06-152025-06-15Flooring/stairs-FloorNon EmergencyOPEN
2025-06-152025-06-15Appliance-RefrigeratorNon EmergencyOPEN
2025-05-222025-05-22Water Leak-Heavy FlowEmergencyOPEN

Housing Maintenance Code Violations

This table shows violations of the NYC Housing Maintenance Code (HMC) issued by HPD for 2950 Park Avenue. These violations are related to conditions such as lack of heat, hot water, mold, pests, and other habitability issues. Class B and C violations are the most serious and may indicate significant problems with building maintenance or safety.

Inspection DateClassStatusStatus DateApartmentNOV DescriptionCertified Date
2024-12-11CCloseNone136B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE FIRE RATED SELF CLOSING DOOR '' DAMAGE '' IN THE ENTRANCE LOCATED AT APT 136B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH2024-12-20T00:00:00.000Z
2024-10-23ACloseNone328§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 328, 3rd STORY, 5th APARTMENT FROM SOUTH AT WEST2024-12-12T00:00:00.000Z
2024-10-23CCloseNone328§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE FRAME IN THE ENTRANCE LOCATED AT APT 328, 3rd STORY, 5th APARTMENT FROM SOUTH AT WEST2024-11-12T00:00:00.000Z
2024-10-23BCloseNone328§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SPLASH BOARD AT NORTH WALL IN THE KITCHEN LOCATED AT APT 328, 3rd STORY, 5th APARTMENT FROM SOUTH AT WEST2024-12-12T00:00:00.000Z
2024-10-23ACloseNone328§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 328, 3rd STORY, 5th APARTMENT FROM SOUTH AT WEST2024-12-12T00:00:00.000Z

311 Service Requests

Service requests made to 311 for 2950 Park Avenue. Data from NYC 311.

Created DateTypeDescriptionStatusAgencyResolution
2025-05-22 00:33WATER LEAKHEAVY FLOWOpenHPD
2025-05-08 17:43WATER LEAKHEAVY FLOWOpenHPD
2025-04-25 11:35PLUMBINGWATER SUPPLYClosedHPD
2025-04-22 12:01PLUMBINGWATER SUPPLYClosedHPD
2025-04-22 12:01GENERALSIGNAGE MISSINGClosedHPD

DOB Complaints

Department of Buildings complaints regarding 2950 Park Avenue.

Complaint #FiledStatusCategoryInspection DateDisposition
24185042025-06-24ACTIVEElevator: Single Device on Property/No Alternate Service
24102362025-02-12CLOSEDSidewalk Shed/Supported Scaffold/Inadequate/Defect/NONE/NO PMT/NO CERT2025-02-13No Violation Warranted For Complaint At Time Of Inspection (2025-02-13)
24101522025-02-11ACTIVEFaçade (LL11/98) – Unsafe Notification
24079552025-01-09CLOSEDVent/Exhaust – Illegal/Improper2025-01-21No Violation Warranted For Complaint At Time Of Inspection (2025-01-22)
23983502024-08-12CLOSEDWork Without a Permit – Occupied Multiple Dwelling2024-08-12No Violation Warranted For Complaint At Time Of Inspection (2024-08-12)

DOB Violations

Department of Buildings violations regarding 2950 Park Avenue.

Date IssuedCategoryDescriptionStatusComments
2025-05-07V-DOB VIOLATION - ACTIVECYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
2024-08-02V-DOB VIOLATION - ACTIVEFAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2024-06-23V-DOB VIOLATION - ACTIVEFAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2023
2024-05-02V-DOB VIOLATION - ACTIVEFAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2024-02-22V-DOB VIOLATION - ACTIVEFAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024

Indoor Environment Complaints (DOHMH)

The table below shows indoor environment complaints received regarding the conditions at 2950 Park Avenue. The information includes the date, type, description, and status of each complaint. The data is sourced from DOHMH/311.

Bedbug Infestations

The table below shows the bedbug reports filed by the landlord for 2950 Park Avenue. The information includes the file date, infested units, eradicated units, re-infested units, filing start date, and filing end date. The data is sourced from DOHMH. Landlords are required to file these reports; missing data may indicate non-compliance.

File DateInfested UnitsEradicated UnitsRe-infested UnitsFiling Start DateFiling End Date
2024-12-180002023-11-012024-10-31
2023-12-013302022-11-012023-10-31
2022-12-282202021-11-012022-10-31
2021-12-226602020-11-012021-10-31
2021-04-202202019-11-012020-10-31

Rodent Inspections

Recent rodent inspection results for 2950 Park Avenue. Data from NYC DOHMH.

DateTypeResult
2023-06-05InitialPassed
2023-01-18InitialRat Activity
2021-07-21InitialRat Activity
2018-07-09InitialPassed
2018-03-26CompliancePassed

HPD Litigation Explanation

The table below shows the HPD litigation records for 2950 Park Avenue. The information includes the open date, case type, status, judgement, penalty and whether harassment was found. The data is sourced from HPD.

Source: HPD
Open DateCase TypeStatusJudgementPenaltyHarassment found

OATH Cases Explanation

The table below shows the Office of Administrative Trials and Hearings cases for 2950 Park Avenue. The information includes the date, agency, respondent, charge, result, penalty, and status. The data is sourced from OATH.

Source: Office of Administrative Trials and Hearings (OATH)
DateAgencyRespondentChargeResultPenaltyStatus

ECB Violations

Environmental Control Board violations for 2950 Park Avenue. Data from ECB.

DateNumberRespondentDescriptionStatusPenaltyBalance Due
2019-04-2538269430ZMARIAS LOPEZ HOUSING DEVE(CEASE USE)35.M.07,45.H.1,(C/U)76.A.10,17.B.10,26.B.11,70.O.2,71.X.10,(C/U)05.J.10,39.M.07;A CEASE USE ITEMS=76-A-10=REPAIR ALTERED CAR SFAETY AND REPAIR GAP ON CAR DOOR ON RETURN LOOSE END CONTACT NYC DOB FORRESOLVE1250.00.0

Alternative Enforcement Program (AEP) Explanation

The table below shows the Alternative Enforcement Program (AEP) records for 2950 Park Avenue. The information includes the start date, start violations, discharge date, and status. The data is sourced from HPD.

Source: Department of Housing Preservation and Development (HPD)
Start DateStart ViolationsDischarge DateStatus

Vacate Orders Explanation

The table below shows the vacate orders for 2950 Park Avenue. The information includes the effective date, rescinded date, reason, type, and units. The data is sourced from DOB.

Source: Department of Buildings (DOB)
Effective DateRescinded DateReasonTypeUnits

Work Orders Explanation

The table below shows the work orders for 2950 Park Avenue. The information includes the date created, type, description, and charge. The data is sourced from HPD.

Source: Department of Housing Preservation and Development (HPD)
Date CreatedTypeDescriptionCharge

Liens Explanation

The table below shows tax and water liens for 2950 Park Avenue. Information includes tax class, month, water only flag, amount, and cycle. Data is sourced from NYC Department of Finance.

Source: NYC Department of Finance
Tax ClassMonthWater OnlyAmountCycle

Case NumberDateTypeStatusDetails

Sales Records

Sales transactions for 2950 Park Avenue. Data includes sale date, price, buyer, and seller.

DatePriceBuyerSeller

Asbestos Records

Asbestos abatement filings and records for 2950 Park Avenue. Data includes filing date, type, and status.

Start DateEnd DateStatusProcedureFloor

Fire Violations

Violations issued by the Fire Department for this property.

Violation NumberDateDescriptionStatus

Fire Inspections

Fire Department inspection records for this property.

Fire Certificates

Fire safety certificates for this property.

TypeIssue DateExpiration

Water Connections

Water connection permits and records for 2950 Park Avenue. Data includes connection type, date, and status.

MaterialRecord Type

Elevator Permits

Elevator permit records for 2950 Park Avenue. Data includes permit type, issue date, and status.

TypeIssue DateStatus

Landmark Violations

Landmark preservation violations for 2950 Park Avenue. Data includes violation date, type, and status.

DateTypeStatus

Planning Projects

City Planning (ZAP) project applications for this building. Data includes project ID, status, borough, and lot/block information.

Project IDStatusBoroughBlockLot
Sign in to view this data.

Building Permits

Department of Buildings issued building permits for this property. This includes permits for construction, alteration, and demolition work. Data includes permit type, job number, status, and issue date.

Permit TypeJob NumberStatusIssue Date

Electrical Permits

Department of Buildings issued electrical permits for this property. This includes permits for electrical work, installations, and modifications. Data includes permit type, job number, status, and issue date.

Permit TypeJob NumberStatusIssue Date

How 2950 Park Avenue Compares

Loading...

Loading comparison data...

Compare with buildings in Melrose:

0

Comparable Buildings

0

Better Rated

0

Worse Rated

Preview of building report data and features

Unlock Complete Building History

Get access to comprehensive violation records, court cases, landlord portfolios, and detailed maintenance history for this building and thousands of others.

Full violation history
Landlord portfolios
Court case records
PDF/Excel reports
Sign Up for Free Access
No credit card required • Instant access

Nearby Buildings