Building and Landlord Data Analysis Report

230 Echo Place, Bronx, NY 10457

4
DOB Complaints
28
311 Housing Calls
45
Housing Violations
0
Permits

Risk Assessment

91
Low Risk

This building shows minimal signs of maintenance issues based on our analysis.

Our AI predicts there is a 91% chance of no major maintenance issues.
Augrented Insights Report for 230 Echo Place

230 Echo Place, a 10-story, 29-unit residential building constructed in 2007 and owned by Pericles Notias, has experienced several recurring maintenance issues over the past few years. Most recently, in 2025, there are open electrical wiring issues, and in January 2025 there was a heat/hot water problem that was reportedly resolved. The building has had multiple infrastructure concerns, including ventilation system problems in July 2024, intercom issues in September 2024, and various plumbing concerns including sink and water supply problems.

One notable pattern is the recurring issues in apartment 3A, which has been the subject of several violations including mold, plumbing problems, and pest infestations. The property has undergone regular rodent inspections, all of which have passed since 2021, and there have been no reported bedbug infestations in recent years. Various building systems have shown to be problematic, with multiple complaints about doors (both apartment and hallway), heating systems, and general maintenance issues.

The most recent violations include an open door-related violation in apartment 3A as of October 2024, along with other addressed violations concerning doors, lighting in common areas, and heating system notification requirements. The building has generally maintained compliance with bedbug reporting requirements, with zero infested units reported in the past three years. An environmental control board violation from 2021 related to inadequate sidewalk shed lighting was resolved with a penalty of $2,430.

Last updated: July 27, 2025
This report is created with AI and based on the most recent 10 data items in each category. Full reports with 50+ data points are available to subscribers.

Download Full Report for 230 Echo Place

Sign up to download the full building report in PDF or Excel format

Sign Up for Free

230 Echo PlaceBuilding Overview

Renter Risk Rating

This building is in the riskiest 10% of buildings in Mount Hope.

Building Characteristics

Total units 29
Year built 2007
Total area 32645 sq ft
Floors 10
Tax Abatements None
Building Class HEREAFTER ERECTED CLASS A
Preview of building report data and features

Unlock Complete Building History

Get access to comprehensive violation records, court cases, landlord portfolios, and detailed maintenance history for this building and thousands of others.

Full violation history
Landlord portfolios
Court case records
PDF/Excel reports
Sign Up for Free Access
No credit card required • Instant access

Key Building Statistics

4
DOB Complaints
Complaints filed with the Department of Buildings in the last 7 years.
45
Housing Violations
Class B & C housing maintenance code violations.
28
311 Housing Calls
Housing-related 311 service requests in the last 7 years.
0
Work Orders
Repair orders issued by city agencies.
1
ECB Violations
Environmental Control Board violations on record.
1
Evictions
Evictions executed by city marshalls.
1
Rodent Inspections
Rodent inspections conducted by DOHMH.
0
Building Permits
Permits issued by DOB in the last 7 years.

Included Addresses

  • 232 Echo Pl, New York, NY 10457
  • 234 Echo Pl, New York, NY 10457
  • 230 Echo Pl, New York, NY 10457

Map and Aerial View of 230 Echo Place

Street Map View
Loading map...

Loading street map...

Satellite View
Loading satellite view...

Loading satellite view...

Need Directions?

Click on either map to get detailed directions and explore nearby landmarks, parking options, and accessibility features.

Reviews of 230 Echo Place

See what current and past tenants have to say

No reviews yet

Be the first to share your experience living at this property. Your review helps future tenants make informed decisions.

Rate your experience Share honest feedback Help other tenants

Share Your Experience

Help future tenants by leaving an honest review of this property

Login Required

You must be logged in to leave a review. Join our community and share your experience!

Login to Continue
Don't have an account? Sign up here

230 Echo Place Landlord Information

HPD Registration Contacts

Contact data is from NYC HPD building registration.

RoleNameAddress

Landlord Portfolio

Other NYC buildings registered to this landlord.

AddressUnitsCode ViolationsRisk Rating

Landlord Court Records

NYC housing court and civil court records. Name matching only; verify parties are actually the owners by reviewing the case files!

230 Echo Place Rent Control Status

Year Built
Built after 1974
Units
More than 6 units
RGB Registration
Registered
Tax Abatement
Tax abatement found
Year BuiltUnitsRGB RegistrationTax Abatement
After 1974 >6 units Registered Found

Full Building Data for 230 Echo Place

Housing Maintenance Code Complaints

This table shows complaints to 311 related to potential NYC Housing Maintenance Code (HMC) for 230 Echo Place. These complaints are related to conditions such as lack of heat, hot water, mold, pests, and other habitability issues. Class B and C violations are the most serious and may indicate significant problems with building maintenance or safety.

Date ReceivedSttatus DateCategoryTypeStatus
2025-01-312025-01-31Electric-WiringEmergencyOPEN
2025-01-222025-01-24Heat/hot Water-Apartment OnlyEmergencyCLOSE
2024-09-302024-11-11General-Bell/buzzer/intercomNon EmergencyCLOSE
2024-07-112024-08-20General-Ventilation SystemNon EmergencyCLOSE
2024-01-252024-06-21Plumbing-Basin/sinkEmergencyCLOSE

Housing Maintenance Code Violations

This table shows violations of the NYC Housing Maintenance Code (HMC) issued by HPD for 230 Echo Place. These violations are related to conditions such as lack of heat, hot water, mold, pests, and other habitability issues. Class B and C violations are the most serious and may indicate significant problems with building maintenance or safety.

Inspection DateClassStatusStatus DateApartmentNOV DescriptionCertified Date
2024-08-30COpenNone3A§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST2024-10-02T00:00:00.000Z
2024-08-30ACloseNone3A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THEN 10 SQ FEET IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST2024-10-19T00:00:00.000Z
2024-08-30BCloseNone3A§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST2024-10-02T00:00:00.000Z
2024-08-23BCloseNoneNone§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT DOOR TO STAIR A 3RD STORY PUBLIC HALL2024-08-31T00:00:00.000Z
2024-08-23CCloseNoneNone§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE [LATCH] DOOR TO STAIR A AT 3RD STORY PUBLIC HALL2024-08-31T00:00:00.000Z

311 Service Requests

Service requests made to 311 for 230 Echo Place. Data from NYC 311.

Created DateTypeDescriptionStatusAgencyResolution
2025-01-31 15:09ELECTRICWIRINGOpenHPD
2025-01-22 06:19HEAT/HOT WATERAPARTMENT ONLYClosedHPD
2024-09-30 15:12GENERALBELL/BUZZER/INTERCOMClosedHPD
2024-07-11 01:18GENERALVENTILATION SYSTEMClosedHPD
2024-01-25 17:07PLUMBINGBASIN/SINKClosedHPD

DOB Complaints

Department of Buildings complaints regarding 230 Echo Place.

Complaint #FiledStatusCategoryInspection DateDisposition
23173982021-05-14CLOSEDTenant Safety Inspection2021-06-03No Violation Warranted For Complaint At Time Of Inspection (2021-06-03)
23167532021-04-30CLOSEDTenant Safety Inspection2021-04-29No Violation Warranted For Complaint At Time Of Inspection (2021-04-30)
23133842021-02-17CLOSEDSidewalk Shed/Supported Scaffold/Inadequate/Defect/NONE/NO PMT/NO CERT2021-02-19Oath Violation Served (2021-02-19)

DOB Violations

Department of Buildings violations regarding 230 Echo Place.

Date IssuedCategoryDescriptionStatusComments
2019-05-03V*-DOB VIOLATION - DISMISSEDFAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4CONFIRMED SUBMISSION2019-06-24

Indoor Environment Complaints (DOHMH)

The table below shows indoor environment complaints received regarding the conditions at 230 Echo Place. The information includes the date, type, description, and status of each complaint. The data is sourced from DOHMH/311.

Bedbug Infestations

The table below shows the bedbug reports filed by the landlord for 230 Echo Place. The information includes the file date, infested units, eradicated units, re-infested units, filing start date, and filing end date. The data is sourced from DOHMH. Landlords are required to file these reports; missing data may indicate non-compliance.

File DateInfested UnitsEradicated UnitsRe-infested UnitsFiling Start DateFiling End Date
2024-12-020002023-11-012024-10-31
2023-12-130002022-11-012023-10-31
2023-06-080002021-11-012022-10-31
2022-03-170002020-11-012021-10-31
2021-08-250002019-11-012020-10-31

Rodent Inspections

Recent rodent inspection results for 230 Echo Place. Data from NYC DOHMH.

DateTypeResult
2025-05-12InitialPassed
2024-11-12InitialPassed
2024-05-14InitialPassed
2023-11-08InitialPassed
2023-05-05InitialPassed

HPD Litigation Explanation

The table below shows the HPD litigation records for 230 Echo Place. The information includes the open date, case type, status, judgement, penalty and whether harassment was found. The data is sourced from HPD.

Source: HPD
Open DateCase TypeStatusJudgementPenaltyHarassment found

OATH Cases Explanation

The table below shows the Office of Administrative Trials and Hearings cases for 230 Echo Place. The information includes the date, agency, respondent, charge, result, penalty, and status. The data is sourced from OATH.

Source: Office of Administrative Trials and Hearings (OATH)
DateAgencyRespondentChargeResultPenaltyStatus

ECB Violations

Environmental Control Board violations for 230 Echo Place. Data from ECB.

DateNumberRespondentDescriptionStatusPenaltyBalance Due
2021-02-1935544319PADVANCED CONSTRUCTION EQUFAILURE TO PROVIDE PEDESTRIAN PROTECTION.@TIME OF MY INSP I OBSERVED 10STY OCCUPIED BLDG W/SIDEWALK SHED ERECTED.SIDEWALK SHED LIGHTING UNDERNEATH APPROX6 LIGHTS WEREN'T ON OR WORKING.THIS CREATES UNSAFE HAZARDRESOLVE2430.00.0

Alternative Enforcement Program (AEP) Explanation

The table below shows the Alternative Enforcement Program (AEP) records for 230 Echo Place. The information includes the start date, start violations, discharge date, and status. The data is sourced from HPD.

Source: Department of Housing Preservation and Development (HPD)
Start DateStart ViolationsDischarge DateStatus

Vacate Orders Explanation

The table below shows the vacate orders for 230 Echo Place. The information includes the effective date, rescinded date, reason, type, and units. The data is sourced from DOB.

Source: Department of Buildings (DOB)
Effective DateRescinded DateReasonTypeUnits

Work Orders Explanation

The table below shows the work orders for 230 Echo Place. The information includes the date created, type, description, and charge. The data is sourced from HPD.

Source: Department of Housing Preservation and Development (HPD)
Date CreatedTypeDescriptionCharge

Liens Explanation

The table below shows tax and water liens for 230 Echo Place. Information includes tax class, month, water only flag, amount, and cycle. Data is sourced from NYC Department of Finance.

Source: NYC Department of Finance
Tax ClassMonthWater OnlyAmountCycle

Case NumberDateTypeStatusDetails

Sales Records

Sales transactions for 230 Echo Place. Data includes sale date, price, buyer, and seller.

DatePriceBuyerSeller

Asbestos Records

Asbestos abatement filings and records for 230 Echo Place. Data includes filing date, type, and status.

Start DateEnd DateStatusProcedureFloor

Fire Violations

Violations issued by the Fire Department for this property.

Violation NumberDateDescriptionStatus

Fire Inspections

Fire Department inspection records for this property.

Fire Certificates

Fire safety certificates for this property.

TypeIssue DateExpiration

Water Connections

Water connection permits and records for 230 Echo Place. Data includes connection type, date, and status.

MaterialRecord Type

Elevator Permits

Elevator permit records for 230 Echo Place. Data includes permit type, issue date, and status.

TypeIssue DateStatus

Landmark Violations

Landmark preservation violations for 230 Echo Place. Data includes violation date, type, and status.

DateTypeStatus

Planning Projects

City Planning (ZAP) project applications for this building. Data includes project ID, status, borough, and lot/block information.

Project IDStatusBoroughBlockLot
Sign in to view this data.

Building Permits

Department of Buildings issued building permits for this property. This includes permits for construction, alteration, and demolition work. Data includes permit type, job number, status, and issue date.

Permit TypeJob NumberStatusIssue Date

Electrical Permits

Department of Buildings issued electrical permits for this property. This includes permits for electrical work, installations, and modifications. Data includes permit type, job number, status, and issue date.

Permit TypeJob NumberStatusIssue Date

How 230 Echo Place Compares

Loading...

Loading comparison data...

Compare with buildings in Mount Hope:

0

Comparable Buildings

0

Better Rated

0

Worse Rated

Preview of building report data and features

Unlock Complete Building History

Get access to comprehensive violation records, court cases, landlord portfolios, and detailed maintenance history for this building and thousands of others.

Full violation history
Landlord portfolios
Court case records
PDF/Excel reports
Sign Up for Free Access
No credit card required • Instant access

Nearby Buildings