You need to enable JavaScript to use this site.725 Arnow Avenue, Bronx Report | Augrented NYC Apartment Ratings & Reviews
Building and Landlord Data Analysis Report

725 Arnow Avenue, Bronx, NY 10467

6
DOB Complaints
51
311 Housing Calls
45
Housing Violations
0
Permits

Risk Assessment

86
Low Risk

This building shows minimal signs of maintenance issues based on our analysis.

Our AI predicts there is a 86% chance of no major maintenance issues.
Augrented Insights Report for 725 Arnow Avenue

The property at 725 Arnow Avenue is a 2-story, 4-unit building constructed in 1931 and currently owned by Tanya Watson. The building has experienced multiple maintenance and safety issues over recent years, with the most pressing concerns being an active violation regarding bedbug reporting requirements from 2021-2024, and several open violations from 2022-2024 related to building maintenance and safety systems. Recent service requests in 2023 include multiple incidents of no lighting conditions, though these were resolved within days of reporting.

The building has documented historical problems with basic utilities including heat/hot water and electrical systems, as evidenced by multiple emergency complaints in 2022, and there were water leak issues reported in 2022 that were inspected but not issued violations. Significant structural and safety concerns have been documented over the years, including multiple violations related to electrical systems in Apartment G2 that were identified during a September 2021 inspection, such as broken electrical outlets and carbon monoxide detector issues. The building has also faced inspection-related challenges, with complaints about building shaking, illegal conversion, and defective boiler issues recorded in 2020-2022.

Environmental violations include issues with exterior walls and window sills that remain active as of 2024, with associated penalties totaling over $12,500. The property has a documented history of rodent activity, though recent inspections in 2022 passed without issues, suggesting improvement in pest management. Regular inspections and service requests indicate ongoing maintenance needs, with particular attention to building systems such as electricity, plumbing, and general upkeep requirements.

Last updated: July 27, 2025
This report is created with AI and based on the most recent 10 data items in each category. Full reports with 50+ data points are available to subscribers.

Download Full Report for 725 Arnow Avenue

Sign up to download the full building report in PDF or Excel format

Sign Up for Free

725 Arnow Avenue Building Overview

Renter Risk Rating

This building is in the riskiest 10% of buildings in Allerton.

Building Characteristics

Total units 4
Year built 1931
Total area 2680 sq ft
Floors 2
Tax Abatements None
Building Class HEREAFTER CONVERTED CLASS A
Preview of building report data and features

Unlock Complete Building History

Get access to comprehensive violation records, court cases, landlord portfolios, and detailed maintenance history for this building and thousands of others.

Full violation history
Landlord portfolios
Court case records
PDF/Excel reports
Sign Up for Free Access
No credit card required • Instant access

Key Building Statistics

6
DOB Complaints
Complaints filed with the Department of Buildings in the last 7 years.
45
Housing Violations
Class B & C housing maintenance code violations.
51
311 Housing Calls
Housing-related 311 service requests in the last 7 years.
4
Work Orders
Repair orders issued by city agencies.
8
ECB Violations
Environmental Control Board violations on record.
0
Evictions
Evictions executed by city marshalls.
14
Rodent Inspections
Rodent inspections conducted by DOHMH.
0
Building Permits
Permits issued by DOB in the last 7 years.

Map and Aerial View of 725 Arnow Avenue

Street Map View
Loading map...

Loading street map...

Satellite View
Loading satellite view...

Loading satellite view...

Reviews of 725 Arnow Avenue

See what current and past tenants have to say

No reviews yet

Be the first to share your experience living at this property. Your review helps future tenants make informed decisions.

Rate your experience Share honest feedback Help other tenants

Share Your Experience

Help future tenants by leaving an honest review of this property

Login Required

You must be logged in to leave a review. Join our community and share your experience!

Login to Continue
Don't have an account? Sign up here

725 Arnow Avenue Landlord Information

HPD Registration Contacts

Contact data is from NYC HPD building registration.

RoleNameAddress

Landlord Portfolio

Other NYC buildings registered to this landlord.

AddressUnitsCode ViolationsRisk Rating

Landlord Court Records

NYC housing court and civil court records. Name matching only; verify parties are actually the owners by reviewing the case files!

725 Arnow Avenue Rent Control Status

Year Built
Built before 1974
Units
Less than 6 units
RGB Registration
Not registered
Tax Abatement
None found
Year BuiltUnitsRGB RegistrationTax Abatement
Before 1974 <6 units Not registered None

Full Building Data for 725 Arnow Avenue

Housing Maintenance Code Complaints

This table shows complaints to 311 related to potential NYC Housing Maintenance Code (HMC) for 725 Arnow Avenue. These complaints are related to conditions such as lack of heat, hot water, mold, pests, and other habitability issues. Class B and C violations are the most serious and may indicate significant problems with building maintenance or safety.

Date ReceivedSttatus DateCategoryTypeStatus
2023-06-052023-06-08Electric-No LightingEmergencyCLOSE
2023-06-052023-06-08Electric-No LightingEmergencyCLOSE
2023-04-242023-04-27Unsanitary Condition-MoldEmergencyCLOSE
2022-05-132022-05-16Door/window-DoorEmergencyCLOSE
2022-05-132022-05-16Door/window-DoorEmergencyCLOSE

Housing Maintenance Code Violations

This table shows violations of the NYC Housing Maintenance Code (HMC) issued by HPD for 725 Arnow Avenue. These violations are related to conditions such as lack of heat, hot water, mold, pests, and other habitability issues. Class B and C violations are the most serious and may indicate significant problems with building maintenance or safety.

Inspection DateClassStatusStatus DateApartmentNOV DescriptionCertified Date
2024-04-02AOpenNoneNone(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.None
2023-03-16AOpenNoneNone(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.None
2022-02-16AOpenNoneNone(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.None
2021-09-28BOpenNoneG2§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT G2, 1st APARTMENT FROM NORTH AT EASTNone
2021-09-28BOpenNoneG2§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT G2, 1st APARTMENT FROM NORTH AT EASTNone

311 Service Requests

Service requests made to 311 for 725 Arnow Avenue. Data from NYC 311.

Created DateTypeDescriptionStatusAgencyResolution
2023-06-05 12:24ELECTRICNO LIGHTINGClosedHPD
2023-06-05 12:23ELECTRICNO LIGHTINGClosedHPD
2023-04-24 12:08UNSANITARY CONDITIONMOLDClosedHPD
2022-05-13 12:14HEAT/HOT WATERAPARTMENT ONLYClosedHPD
2022-05-13 12:01DOOR/WINDOWDOORClosedHPD

DOB Complaints

Department of Buildings complaints regarding 725 Arnow Avenue.

Complaint #FiledStatusCategoryInspection DateDisposition
23458962022-05-13CLOSEDBuilding Shaking/Vibrating/Struct Stability Affected2022-05-13Oath Violation Served (2022-05-22)
23458972022-05-13CLOSEDIllegal Conversion2022-10-26Access Denied – 2nd Attempt (2022-10-26)
23336742022-03-29CLOSEDBoiler: Defective/Inoperative/No Permit2022-04-07Oath Violation Served (2022-04-07)
23103502020-12-04CLOSEDBuilding Shaking/Vibrating/Struct Stability Affected2020-12-04Oath Violation Served (2020-12-04)
22783372019-03-27CLOSEDCurb Cut/Driveway/Carport – ILLEGAL2019-04-11Oath Violation Served (2019-04-12)

DOB Violations

Department of Buildings violations regarding 725 Arnow Avenue.

Date IssuedCategoryDescriptionStatusComments
2019-09-19V-DOB VIOLATION - ACTIVEFAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-06-26V-DOB VIOLATION - ACTIVEFAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

Indoor Environment Complaints (DOHMH)

The table below shows indoor environment complaints received regarding the conditions at 725 Arnow Avenue. The information includes the date, type, description, and status of each complaint. The data is sourced from DOHMH/311.

Bedbug Infestations

The table below shows the bedbug reports filed by the landlord for 725 Arnow Avenue. The information includes the file date, infested units, eradicated units, re-infested units, filing start date, and filing end date. The data is sourced from DOHMH. Landlords are required to file these reports; missing data may indicate non-compliance.

File DateInfested UnitsEradicated UnitsRe-infested UnitsFiling Start DateFiling End Date

Rodent Inspections

Recent rodent inspection results for 725 Arnow Avenue. Data from NYC DOHMH.

DateTypeResult
2022-05-23InitialPassed
2018-07-30BAITBait applied
2018-07-11BAITBait applied
2018-04-09ComplianceRat Activity
2018-03-01InitialRat Activity

HPD Litigation Explanation

The table below shows the HPD litigation records for 725 Arnow Avenue. The information includes the open date, case type, status, judgement, penalty and whether harassment was found. The data is sourced from HPD.

Source: HPD
Open DateCase TypeStatusJudgementPenaltyHarassment found

OATH Cases Explanation

The table below shows the Office of Administrative Trials and Hearings cases for 725 Arnow Avenue. The information includes the date, agency, respondent, charge, result, penalty, and status. The data is sourced from OATH.

Source: Office of Administrative Trials and Hearings (OATH)
DateAgencyRespondentChargeResultPenaltyStatus

ECB Violations

Environmental Control Board violations for 725 Arnow Avenue. Data from ECB.

DateNumberRespondentDescriptionStatusPenaltyBalance Due
2022-05-1335582022LTANVA WATSON 1FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT TIME OFINSPECTION OBSERVED WINDOWSILL AT 2ND FLOOR OF EXPOSURE#1 A SECTION OFMISSING STOVE WITH CRACK.REM:MAINTAIN BUILDING IN CODE COMPLIANT MANNEACTIVE6250.06250.0
2022-04-0739059747HTANYA WATSONAS PER CLASS 254-36 BOILER NOT REGISTER AS PER DOB RECORDS FOUND IN ÝAPT 2¨ A GAS BOILER MAKE LUMA 3 DIRECT VENT BOILER BTU 354 , WALL HANG CORRECT ALL VIOLATING CONDITIONS AND SUMIT A CERTIFICATE OF CORRECTIONACTIVE3125.03125.0
2020-12-0439033005NTANYA WATSONFAILURE TO MAINTAIN BUILDING EXTERIOR WALLS IN A CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED A BROKEN CONCRETE WINDOW SILL AT 2ND STORY WINDOW EXPOSURE # 1., REPAIR AND/OR REPLACEACTIVE3125.03125.0
2020-01-1437017290ZTANYA WATSONFAILURE TO COMPLY W/ COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35248722Z ISSUED ON 4/11/19,AND TO FILE A CERTIFICATE OF CORRECTIONPURSUANT TO 28.201.1 AND 1RCNY 102-01(D)(2). AN ACCEPTABLE CERTIFICATEACTIVE6250.06250.0
2019-06-1835434346NTANYA WATSONFAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY AT EXP3 THERE IS A VEHICLE PARKED OBSTRUCTING EXIT PASSAGEWAY.MERCEDES BENZ SILVER IS CAR AND COLOR. RMDY: REMOVE OBSTRUCTION.ACTIVE1250.01250.0

Alternative Enforcement Program (AEP) Explanation

The table below shows the Alternative Enforcement Program (AEP) records for 725 Arnow Avenue. The information includes the start date, start violations, discharge date, and status. The data is sourced from HPD.

Source: Department of Housing Preservation and Development (HPD)
Start DateStart ViolationsDischarge DateStatus

Vacate Orders Explanation

The table below shows the vacate orders for 725 Arnow Avenue. The information includes the effective date, rescinded date, reason, type, and units. The data is sourced from DOB.

Source: Department of Buildings (DOB)
Effective DateRescinded DateReasonTypeUnits

Work Orders Explanation

The table below shows the work orders for 725 Arnow Avenue. The information includes the date created, type, description, and charge. The data is sourced from HPD.

Source: Department of Housing Preservation and Development (HPD)
Date CreatedTypeDescriptionCharge

Liens Explanation

The table below shows tax and water liens for 725 Arnow Avenue. Information includes tax class, month, water only flag, amount, and cycle. Data is sourced from NYC Department of Finance.

Source: NYC Department of Finance
Tax ClassMonthWater OnlyAmountCycle

Case NumberDateTypeStatusDetails

Sales Records

Sales transactions for 725 Arnow Avenue. Data includes sale date, price, buyer, and seller.

DatePriceBuyerSeller

Asbestos Records

Asbestos abatement filings and records for 725 Arnow Avenue. Data includes filing date, type, and status.

Start DateEnd DateStatusProcedureFloor

Fire Violations

Violations issued by the Fire Department for this property.

Violation NumberDateDescriptionStatus

Fire Inspections

Fire Department inspection records for this property.

Fire Certificates

Fire safety certificates for this property.

TypeIssue DateExpiration

Water Connections

Water connection permits and records for 725 Arnow Avenue. Data includes connection type, date, and status.

MaterialRecord Type

Elevator Permits

Elevator permit records for 725 Arnow Avenue. Data includes permit type, issue date, and status.

TypeIssue DateStatus

Landmark Violations

Landmark preservation violations for 725 Arnow Avenue. Data includes violation date, type, and status.

DateTypeStatus

Planning Projects

City Planning (ZAP) project applications for this building. Data includes project ID, status, borough, and lot/block information.

Project IDStatusBoroughBlockLot
Sign in to view this data.

Building Permits

Department of Buildings issued building permits for this property. This includes permits for construction, alteration, and demolition work. Data includes permit type, job number, status, and issue date.

Permit TypeJob NumberStatusIssue Date

Electrical Permits

Department of Buildings issued electrical permits for this property. This includes permits for electrical work, installations, and modifications. Data includes permit type, job number, status, and issue date.

Permit TypeJob NumberStatusIssue Date

How 725 Arnow Avenue Compares

Loading...

Loading comparison data...

Compare with buildings in Allerton:

0

Comparable Buildings

0

Better Rated

0

Worse Rated

Preview of building report data and features

Unlock Complete Building History

Get access to comprehensive violation records, court cases, landlord portfolios, and detailed maintenance history for this building and thousands of others.

Full violation history
Landlord portfolios
Court case records
PDF/Excel reports
Sign Up for Free Access
No credit card required • Instant access

Nearby Buildings