You need to enable JavaScript to use this site.72-45 60th Lane, Queens Report | Augrented NYC Apartment Ratings & Reviews
Building and Landlord Data Analysis Report

72-45 60th Lane, Queens, NY 11385

2
DOB Complaints
5
311 Housing Calls
3
Housing Violations
0
Permits

Risk Assessment

97
Low Risk

This building shows minimal signs of maintenance issues based on our analysis.

Our AI predicts there is a 97% chance of no major maintenance issues.
Augrented Insights Report for 72-45 60th Lane

72-45 60th Lane in Glendale is a 2-story, 4-unit residential building constructed in 1931, currently owned by Daniel Barcelowsky. The building has experienced recurring pest control issues over the past several years, with multiple reports of rodent activity, including sightings in 2023 and 2021 that required inspections by the Department of Health and Mental Hygiene. A significant cluster of pest-related complaints occurred in 2022, including an HPD inspection that resulted in violations.

The building has also faced notable maintenance challenges, including a heat and hot water emergency in January 2020 that reportedly improved after initial complaints. Multiple violations were documented in February 2022 for apartment 2R, including problems with window guards and self-closing doors, though some of these have since been closed. The property has undergone regular inspections for rodent activity, with the most recent in June 2023 showing no violations, though earlier inspections in 2022 and 2020 noted problems.

Notably, the building has maintained a clean record concerning bedbugs in recent filings, with no infested or re-infested units reported in the last three annual bedbug reports from 2024 and 2023. The building's history includes two complaints in 2022 and 2023 regarding unauthorized work and illegal conversion, though inspectors were unable to gain access during their final attempts to investigate these concerns. Regular inspections and compliance checks suggest ongoing attention to maintenance requirements, with the most recent violations related to bedbug reporting requirements being noted in 2023 and 2024.

Last updated: July 27, 2025
This report is created with AI and based on the most recent 10 data items in each category. Full reports with 50+ data points are available to subscribers.

Download Full Report for 72-45 60th Lane

Sign up to download the full building report in PDF or Excel format

Sign Up for Free

72-45 60th Lane Building Overview

Renter Risk Rating

This building is in the riskiest 10% of buildings in Glendale.

Building Characteristics

Total units 4
Year built 1931
Total area 3484 sq ft
Floors 2
Tax Abatements None
Building Class NEW LAW TENEMENT
Preview of building report data and features

Unlock Complete Building History

Get access to comprehensive violation records, court cases, landlord portfolios, and detailed maintenance history for this building and thousands of others.

Full violation history
Landlord portfolios
Court case records
PDF/Excel reports
Sign Up for Free Access
No credit card required • Instant access

Key Building Statistics

2
DOB Complaints
Complaints filed with the Department of Buildings in the last 7 years.
3
Housing Violations
Class B & C housing maintenance code violations.
5
311 Housing Calls
Housing-related 311 service requests in the last 7 years.
2
Work Orders
Repair orders issued by city agencies.
0
ECB Violations
Environmental Control Board violations on record.
0
Evictions
Evictions executed by city marshalls.
1
Rodent Inspections
Rodent inspections conducted by DOHMH.
0
Building Permits
Permits issued by DOB in the last 7 years.

Map and Aerial View of 72-45 60th Lane

Street Map View
Loading map...

Loading street map...

Satellite View
Loading satellite view...

Loading satellite view...

Reviews of 72-45 60th Lane

See what current and past tenants have to say

No reviews yet

Be the first to share your experience living at this property. Your review helps future tenants make informed decisions.

Rate your experience Share honest feedback Help other tenants

Share Your Experience

Help future tenants by leaving an honest review of this property

Login Required

You must be logged in to leave a review. Join our community and share your experience!

Login to Continue
Don't have an account? Sign up here

72-45 60th Lane Landlord Information

HPD Registration Contacts

Contact data is from NYC HPD building registration.

RoleNameAddress

Landlord Portfolio

Other NYC buildings registered to this landlord.

AddressUnitsCode ViolationsRisk Rating

Landlord Court Records

NYC housing court and civil court records. Name matching only; verify parties are actually the owners by reviewing the case files!

72-45 60th Lane Rent Control Status

Year Built
Built before 1974
Units
Less than 6 units
RGB Registration
Not registered
Tax Abatement
None found
Year BuiltUnitsRGB RegistrationTax Abatement
Before 1974 <6 units Not registered None

Full Building Data for 72-45 60th Lane

Housing Maintenance Code Complaints

This table shows complaints to 311 related to potential NYC Housing Maintenance Code (HMC) for 72-45 60th Lane. These complaints are related to conditions such as lack of heat, hot water, mold, pests, and other habitability issues. Class B and C violations are the most serious and may indicate significant problems with building maintenance or safety.

Date ReceivedSttatus DateCategoryTypeStatus
2022-01-172022-02-03Unsanitary Condition-PestsNon EmergencyCLOSE
2020-01-302020-02-01Heat/hot Water-Entire BuildingEmergencyCLOSE

Housing Maintenance Code Violations

This table shows violations of the NYC Housing Maintenance Code (HMC) issued by HPD for 72-45 60th Lane. These violations are related to conditions such as lack of heat, hot water, mold, pests, and other habitability issues. Class B and C violations are the most serious and may indicate significant problems with building maintenance or safety.

Inspection DateClassStatusStatus DateApartmentNOV DescriptionCertified Date
2024-04-15ACloseNoneNone(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.None
2023-03-28ACloseNoneNone(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.None
2022-03-03ACloseNoneNone(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.None
2022-02-02COpenNone2RHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM NORTH AT EASTNone
2022-02-02CCloseNone2R§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2, WG TO REPLACE = 9, WG TO REPAIR = 0 IN THE KITCHEN LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM NORTH AT EASTNone

311 Service Requests

Service requests made to 311 for 72-45 60th Lane. Data from NYC 311.

Created DateTypeDescriptionStatusAgencyResolution
2023-06-16 18:43RodentRat SightingClosedDOHMH
2022-11-07 21:03RodentSigns of RodentsClosedDOHMH
2022-01-17 08:07UNSANITARY CONDITIONPESTSClosedHPD
2021-07-19 12:04RodentRat SightingClosedDOHMH
2020-01-30 13:35HEAT/HOT WATERENTIRE BUILDINGClosedHPD

DOB Complaints

Department of Buildings complaints regarding 72-45 60th Lane.

Complaint #FiledStatusCategoryInspection DateDisposition
49136422023-01-26CLOSEDWork Without a Permit – Occupied Multiple Dwelling2023-01-26Inspector Unable To Gain Access – 2nd Final Attempt (2023-01-26)
48943282022-07-01CLOSEDIllegal Conversion2023-02-06Inspector Unable To Gain Access – 2nd Final Attempt (2023-02-07)

DOB Violations

Department of Buildings violations regarding 72-45 60th Lane.

Date IssuedCategoryDescriptionStatusComments

Indoor Environment Complaints (DOHMH)

The table below shows indoor environment complaints received regarding the conditions at 72-45 60th Lane. The information includes the date, type, description, and status of each complaint. The data is sourced from DOHMH/311.

Bedbug Infestations

The table below shows the bedbug reports filed by the landlord for 72-45 60th Lane. The information includes the file date, infested units, eradicated units, re-infested units, filing start date, and filing end date. The data is sourced from DOHMH. Landlords are required to file these reports; missing data may indicate non-compliance.

File DateInfested UnitsEradicated UnitsRe-infested UnitsFiling Start DateFiling End Date
2024-12-110002023-11-012024-10-31
2024-04-240002022-11-012023-10-31

Rodent Inspections

Recent rodent inspection results for 72-45 60th Lane. Data from NYC DOHMH.

DateTypeResult
2023-06-29InitialPassed
2023-01-09CompliancePassed
2022-10-26InitialRat Activity
2021-08-10InitialPassed

HPD Litigation Explanation

The table below shows the HPD litigation records for 72-45 60th Lane. The information includes the open date, case type, status, judgement, penalty and whether harassment was found. The data is sourced from HPD.

Source: HPD
Open DateCase TypeStatusJudgementPenaltyHarassment found

OATH Cases Explanation

The table below shows the Office of Administrative Trials and Hearings cases for 72-45 60th Lane. The information includes the date, agency, respondent, charge, result, penalty, and status. The data is sourced from OATH.

Source: Office of Administrative Trials and Hearings (OATH)
DateAgencyRespondentChargeResultPenaltyStatus

ECB Violations

Environmental Control Board violations for 72-45 60th Lane. Data from ECB.

DateNumberRespondentDescriptionStatusPenaltyBalance Due

Alternative Enforcement Program (AEP) Explanation

The table below shows the Alternative Enforcement Program (AEP) records for 72-45 60th Lane. The information includes the start date, start violations, discharge date, and status. The data is sourced from HPD.

Source: Department of Housing Preservation and Development (HPD)
Start DateStart ViolationsDischarge DateStatus

Vacate Orders Explanation

The table below shows the vacate orders for 72-45 60th Lane. The information includes the effective date, rescinded date, reason, type, and units. The data is sourced from DOB.

Source: Department of Buildings (DOB)
Effective DateRescinded DateReasonTypeUnits

Work Orders Explanation

The table below shows the work orders for 72-45 60th Lane. The information includes the date created, type, description, and charge. The data is sourced from HPD.

Source: Department of Housing Preservation and Development (HPD)
Date CreatedTypeDescriptionCharge

Liens Explanation

The table below shows tax and water liens for 72-45 60th Lane. Information includes tax class, month, water only flag, amount, and cycle. Data is sourced from NYC Department of Finance.

Source: NYC Department of Finance
Tax ClassMonthWater OnlyAmountCycle

Case NumberDateTypeStatusDetails

Sales Records

Sales transactions for 72-45 60th Lane. Data includes sale date, price, buyer, and seller.

DatePriceBuyerSeller

Asbestos Records

Asbestos abatement filings and records for 72-45 60th Lane. Data includes filing date, type, and status.

Start DateEnd DateStatusProcedureFloor

Fire Violations

Violations issued by the Fire Department for this property.

Violation NumberDateDescriptionStatus

Fire Inspections

Fire Department inspection records for this property.

Fire Certificates

Fire safety certificates for this property.

TypeIssue DateExpiration

Water Connections

Water connection permits and records for 72-45 60th Lane. Data includes connection type, date, and status.

MaterialRecord Type

Elevator Permits

Elevator permit records for 72-45 60th Lane. Data includes permit type, issue date, and status.

TypeIssue DateStatus

Landmark Violations

Landmark preservation violations for 72-45 60th Lane. Data includes violation date, type, and status.

DateTypeStatus

Planning Projects

City Planning (ZAP) project applications for this building. Data includes project ID, status, borough, and lot/block information.

Project IDStatusBoroughBlockLot
Sign in to view this data.

Building Permits

Department of Buildings issued building permits for this property. This includes permits for construction, alteration, and demolition work. Data includes permit type, job number, status, and issue date.

Permit TypeJob NumberStatusIssue Date

Electrical Permits

Department of Buildings issued electrical permits for this property. This includes permits for electrical work, installations, and modifications. Data includes permit type, job number, status, and issue date.

Permit TypeJob NumberStatusIssue Date

How 72-45 60th Lane Compares

Loading...

Loading comparison data...

Compare with buildings in Glendale:

0

Comparable Buildings

0

Better Rated

0

Worse Rated

Preview of building report data and features

Unlock Complete Building History

Get access to comprehensive violation records, court cases, landlord portfolios, and detailed maintenance history for this building and thousands of others.

Full violation history
Landlord portfolios
Court case records
PDF/Excel reports
Sign Up for Free Access
No credit card required • Instant access

Nearby Buildings