You need to enable JavaScript to use this site.34-02 153rd Street, Queens Report | Augrented NYC Apartment Ratings & Reviews
Building and Landlord Data Analysis Report

34-02 153rd Street, Queens, NY 11354

1
DOB Complaints
55
311 Housing Calls
68
Housing Violations
0
Permits

Risk Assessment

63
Moderate Risk

This building shows some maintenance concerns that warrant attention.

Our AI predicts there is a 63% chance of no major maintenance issues.
Augrented Insights Report for 34-02 153rd Street

34-02 153rd Street is a 40-unit, four-story residential building located in Flushing, constructed in 1926 as a New Law Tenement. The property has experienced recurring heating system issues throughout 2025, with multiple complaints documented between March and May 2025 regarding lack of heat and hot water affecting the entire building. While most of these complaints were eventually closed after inspections were conducted or when heat and hot water were reportedly restored, some complaints noted difficulty in accessing apartments for verification.

These heating issues appear to be persistent, with a similar pattern of complaints emerging repeatedly during this period. The building's maintenance history from recent years reveals several concerning health and safety issues. Apartment A8 was found in October 2024 to have multiple violations related to defective carbon monoxide and smoke detectors, as well as infestations of roaches and mice. Apartment A9 had documented issues including water leaks, mold, and plaster damage in mid-2024, though these violations were later certified as corrected.

Additional violations from 2022 include problems with boiler equipment that resulted in an oath violation. Notably, the building has maintained a clean record regarding bedbugs, with no reported infestations over the past six years according to the bedbug reporting system. Two sidewalk shed inspections in early 2025 were conducted, finding no violations at the time of inspection or fully rescinding a previously issued stop work order. The property owner is John Milevoi, and while many violations have been closed through proper certification, several remain open in different departments, indicating ongoing maintenance requirements.

Last updated: July 27, 2025
This report is created with AI and based on the most recent 10 data items in each category. Full reports with 50+ data points are available to subscribers.

Download Full Report for 34-02 153rd Street

Sign up to download the full building report in PDF or Excel format

Sign Up for Free

34-02 153rd Street Building Overview

Renter Risk Rating

This building is in the riskiest 10% of buildings in Flushing.

Building Characteristics

Total units 40
Year built 1926
Total area 31648 sq ft
Floors 4
Tax Abatements None
Building Class NEW LAW TENEMENT
Preview of building report data and features

Unlock Complete Building History

Get access to comprehensive violation records, court cases, landlord portfolios, and detailed maintenance history for this building and thousands of others.

Full violation history
Landlord portfolios
Court case records
PDF/Excel reports
Sign Up for Free Access
No credit card required • Instant access

Key Building Statistics

1
DOB Complaints
Complaints filed with the Department of Buildings in the last 7 years.
68
Housing Violations
Class B & C housing maintenance code violations.
55
311 Housing Calls
Housing-related 311 service requests in the last 7 years.
2
Work Orders
Repair orders issued by city agencies.
1
ECB Violations
Environmental Control Board violations on record.
1
Evictions
Evictions executed by city marshalls.
0
Rodent Inspections
Rodent inspections conducted by DOHMH.
0
Building Permits
Permits issued by DOB in the last 7 years.

Included Addresses

  • 15126 34th Ave, New York, NY 11354
  • 15128 34th Ave, New York, NY 11354
  • 34-02 153rd St, New York, NY 11354

Map and Aerial View of 34-02 153rd Street

Street Map View
Loading map...

Loading street map...

Satellite View
Loading satellite view...

Loading satellite view...

Reviews of 34-02 153rd Street

See what current and past tenants have to say

No reviews yet

Be the first to share your experience living at this property. Your review helps future tenants make informed decisions.

Rate your experience Share honest feedback Help other tenants

Share Your Experience

Help future tenants by leaving an honest review of this property

Login Required

You must be logged in to leave a review. Join our community and share your experience!

Login to Continue
Don't have an account? Sign up here

34-02 153rd Street Landlord Information

HPD Registration Contacts

Contact data is from NYC HPD building registration.

RoleNameAddress

Landlord Portfolio

Other NYC buildings registered to this landlord.

AddressUnitsCode ViolationsRisk Rating

Landlord Court Records

NYC housing court and civil court records. Name matching only; verify parties are actually the owners by reviewing the case files!

34-02 153rd Street Rent Control Status

Year Built
Built before 1974
Units
More than 6 units
RGB Registration
Registered
Tax Abatement
None found
Year BuiltUnitsRGB RegistrationTax Abatement
Before 1974 >6 units Registered None

Full Building Data for 34-02 153rd Street

Housing Maintenance Code Complaints

This table shows complaints to 311 related to potential NYC Housing Maintenance Code (HMC) for 34-02 153rd Street. These complaints are related to conditions such as lack of heat, hot water, mold, pests, and other habitability issues. Class B and C violations are the most serious and may indicate significant problems with building maintenance or safety.

Date ReceivedSttatus DateCategoryTypeStatus
2025-05-022025-05-03Heat/hot Water-Entire BuildingEmergencyCLOSE
2025-04-092025-04-11Heat/hot Water-Entire BuildingEmergencyCLOSE
2025-04-092025-04-11Heat/hot Water-Entire BuildingEmergencyCLOSE
2025-04-072025-04-09Heat/hot Water-Entire BuildingEmergencyCLOSE
2025-04-012025-04-04Heat/hot Water-Entire BuildingEmergencyCLOSE

Housing Maintenance Code Violations

This table shows violations of the NYC Housing Maintenance Code (HMC) issued by HPD for 34-02 153rd Street. These violations are related to conditions such as lack of heat, hot water, mold, pests, and other habitability issues. Class B and C violations are the most serious and may indicate significant problems with building maintenance or safety.

Inspection DateClassStatusStatus DateApartmentNOV DescriptionCertified Date
2024-10-09BOpenNoneA8§ 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT A8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTNone
2024-10-09BCloseNoneA8§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT A8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST2024-10-28T00:00:00.000Z
2024-10-09COpenNoneA8HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT A8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTNone
2024-10-09COpenNoneA8HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT A8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTNone
2024-07-26CCloseNoneNone§ 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING CONSISTING OF HOOK AND EYE INSTALLED ON BUILDING ENTRANCE DOOR TO PUBLIC HALL , 1st STORY2024-08-09T00:00:00.000Z

311 Service Requests

Service requests made to 311 for 34-02 153rd Street. Data from NYC 311.

Created DateTypeDescriptionStatusAgencyResolution
2025-05-02 05:17HEAT/HOT WATERENTIRE BUILDINGClosedHPD
2025-04-09 17:54HEAT/HOT WATERENTIRE BUILDINGClosedHPD
2025-04-09 04:54HEAT/HOT WATERENTIRE BUILDINGClosedHPD
2025-04-07 19:47HEAT/HOT WATERENTIRE BUILDINGClosedHPD
2025-04-01 21:04HEAT/HOT WATERENTIRE BUILDINGClosedHPD

DOB Complaints

Department of Buildings complaints regarding 34-02 153rd Street.

Complaint #FiledStatusCategoryInspection DateDisposition
49867002025-02-04CLOSEDSidewalk Shed/Supported Scaffold/Inadequate/Defect/NONE/NO PMT/NO CERT2025-02-05No Violation Warranted For Complaint At Time Of Inspection (2025-02-05)
49856992025-01-23CLOSEDSidewalk Shed/Supported Scaffold/Inadequate/Defect/NONE/NO PMT/NO CERT2025-04-11Stop Work Order Fully Rescinded (2025-04-11)
48987112022-08-12CLOSEDBoiler: Defective/Inoperative/No Permit2022-08-12Oath Violation Served (2022-08-15)

DOB Violations

Department of Buildings violations regarding 34-02 153rd Street.

Date IssuedCategoryDescriptionStatusComments

Indoor Environment Complaints (DOHMH)

The table below shows indoor environment complaints received regarding the conditions at 34-02 153rd Street. The information includes the date, type, description, and status of each complaint. The data is sourced from DOHMH/311.

Bedbug Infestations

The table below shows the bedbug reports filed by the landlord for 34-02 153rd Street. The information includes the file date, infested units, eradicated units, re-infested units, filing start date, and filing end date. The data is sourced from DOHMH. Landlords are required to file these reports; missing data may indicate non-compliance.

File DateInfested UnitsEradicated UnitsRe-infested UnitsFiling Start DateFiling End Date
2025-05-020002023-11-012024-10-31
2024-04-030002022-11-012023-10-31
2023-03-160002021-11-012022-10-31
2022-05-230002020-11-012021-10-31
2021-03-150002019-11-012020-10-31

Rodent Inspections

Recent rodent inspection results for 34-02 153rd Street. Data from NYC DOHMH.

HPD Litigation Explanation

The table below shows the HPD litigation records for 34-02 153rd Street. The information includes the open date, case type, status, judgement, penalty and whether harassment was found. The data is sourced from HPD.

Source: HPD
Open DateCase TypeStatusJudgementPenaltyHarassment found

OATH Cases Explanation

The table below shows the Office of Administrative Trials and Hearings cases for 34-02 153rd Street. The information includes the date, agency, respondent, charge, result, penalty, and status. The data is sourced from OATH.

Source: Office of Administrative Trials and Hearings (OATH)
DateAgencyRespondentChargeResultPenaltyStatus

ECB Violations

Environmental Control Board violations for 34-02 153rd Street. Data from ECB.

DateNumberRespondentDescriptionStatusPenaltyBalance Due
2022-08-1239067972YM & L 153D STREET REALTYLUGS MISSING ON CLEAN OUT PLATES, DISCHARGE PIPE MISSING FROM VALVE BODY ON RELIEF VALVE, GAS VENT ON BURNER MUST BE HARD PIPED, SITE GLASS MISSING ON REAR DOOR CLEAN OUT MISSING ON CHIMNEY BASE CORRECT ALL VIOACTIVE312.00.0

Alternative Enforcement Program (AEP) Explanation

The table below shows the Alternative Enforcement Program (AEP) records for 34-02 153rd Street. The information includes the start date, start violations, discharge date, and status. The data is sourced from HPD.

Source: Department of Housing Preservation and Development (HPD)
Start DateStart ViolationsDischarge DateStatus

Vacate Orders Explanation

The table below shows the vacate orders for 34-02 153rd Street. The information includes the effective date, rescinded date, reason, type, and units. The data is sourced from DOB.

Source: Department of Buildings (DOB)
Effective DateRescinded DateReasonTypeUnits

Work Orders Explanation

The table below shows the work orders for 34-02 153rd Street. The information includes the date created, type, description, and charge. The data is sourced from HPD.

Source: Department of Housing Preservation and Development (HPD)
Date CreatedTypeDescriptionCharge

Liens Explanation

The table below shows tax and water liens for 34-02 153rd Street. Information includes tax class, month, water only flag, amount, and cycle. Data is sourced from NYC Department of Finance.

Source: NYC Department of Finance
Tax ClassMonthWater OnlyAmountCycle

Case NumberDateTypeStatusDetails

Sales Records

Sales transactions for 34-02 153rd Street. Data includes sale date, price, buyer, and seller.

DatePriceBuyerSeller

Asbestos Records

Asbestos abatement filings and records for 34-02 153rd Street. Data includes filing date, type, and status.

Start DateEnd DateStatusProcedureFloor

Fire Violations

Violations issued by the Fire Department for this property.

Violation NumberDateDescriptionStatus

Fire Inspections

Fire Department inspection records for this property.

Fire Certificates

Fire safety certificates for this property.

TypeIssue DateExpiration

Water Connections

Water connection permits and records for 34-02 153rd Street. Data includes connection type, date, and status.

MaterialRecord Type

Elevator Permits

Elevator permit records for 34-02 153rd Street. Data includes permit type, issue date, and status.

TypeIssue DateStatus

Landmark Violations

Landmark preservation violations for 34-02 153rd Street. Data includes violation date, type, and status.

DateTypeStatus

Planning Projects

City Planning (ZAP) project applications for this building. Data includes project ID, status, borough, and lot/block information.

Project IDStatusBoroughBlockLot
Sign in to view this data.

Building Permits

Department of Buildings issued building permits for this property. This includes permits for construction, alteration, and demolition work. Data includes permit type, job number, status, and issue date.

Permit TypeJob NumberStatusIssue Date

Electrical Permits

Department of Buildings issued electrical permits for this property. This includes permits for electrical work, installations, and modifications. Data includes permit type, job number, status, and issue date.

Permit TypeJob NumberStatusIssue Date

How 34-02 153rd Street Compares

Loading...

Loading comparison data...

Compare with buildings in Flushing:

0

Comparable Buildings

0

Better Rated

0

Worse Rated

Preview of building report data and features

Unlock Complete Building History

Get access to comprehensive violation records, court cases, landlord portfolios, and detailed maintenance history for this building and thousands of others.

Full violation history
Landlord portfolios
Court case records
PDF/Excel reports
Sign Up for Free Access
No credit card required • Instant access

Nearby Buildings