Free SF apartment background check

1075-1077 Valencia St

Inner Mission, SF 94110 3616015 8 units · 2 fl · 1925

This building has significantly more problems than most nearby buildings. A handful of unresolved issues. Worth a careful walk-through and pointed questions.

NOVs (7y) vs. neighborhood
Compared to a typical building in Inner Mission
At or below average
avg 2.6
0
FewerMore

This building has 0 novs (7y), at or below the Inner Mission average of 2.6.

Rent & eviction protection

Is 1075-1077 Valencia St rent-controlled?

San Francisco's Rent Ordinance caps rent increases and provides eviction protection for most residential units built before 1979 with 2+ units. Here's how this building scores.

Built before 1979
Built 1925
2 or more units
8 units
Property type
Multi-Family Residential
Zoning
VALEN
Likely rent-controlled. Building age and unit count suggest this property falls under San Francisco's Rent Ordinance.

Based on SF Assessor records. Not legal advice — confirm with the SF Rent Board.

Building characteristics
Units8
Floors2
Year built1925
Total area7,224 sq ft
Property typeMulti-Family Residential
Tax statusHome Owners
Blocklot3616015
Ownership

Registered owner per SF Assessor-Recorder (secured roll).

Owner name
Olszewski Paul J
Mailing address
1077 Valencia St San Francisco CA 94110
Last sale
000000

Landlord portfolio

Other SF properties this owner holds, with risk grades for each.

Unlock complete report
Multiple entrances & addresses

Included addresses

All street addresses sharing this blocklot that are covered by this report.

1077 Valencia St, San Francisco, CA 94110
1075 Valencia St, San Francisco, CA 94110
Augrented Insights
Initial analysis

The 1075-1077 Valencia Street property is a 2-story, 8-unit multi-family residential building located in San Francisco's Inner Mission neighborhood, built in 1925 and currently owned by Paul J. Olszewski. The building has undergone significant improvements in recent years, with the most substantial work related to a mandatory soft-story retrofit completed in 2018 (Tier 4), which included structural modifications and electrical upgrades. Unit 7 received particular attention in 2017-2018, undergoing comprehensive renovations including kitchen remodeling, electrical system upgrades (new sub-panel, receptacles, lights, switches), and plumbing work (new gas line and waste line modifications). Other units have also received improvements, including Unit 1 which underwent electrical panel upgrades and related installations in 2016.

The building's history shows regular maintenance and compliance with safety requirements, though there were several violations in 2003-2008 related to fire safety (e.g., fire extinguisher maintenance, egress obstructions) and security (e.g., self-closing doors), all of which were promptly addressed and abated. Recent activities include routine inspections in 2015 and 2008, and some street space permits issued between 2017-2020. A complaint regarding unpermitted banners was filed in December 2024, though this appears to be more about general urban conditions rather than specific building issues. Two planning records are noted regarding a proposed spiral staircase between units 6 and 7 and a condominium development proposal, but both are marked as closed. The building's compliance with the soft-story retrofit requirement and ongoing maintenance activities suggest attention to structural integrity and resident safety, while recent improvements indicate continued investment in the property's upkeep.

AI-generated · may contain errors · check the source data tables below

Free account unlocks the full analysis — plus 2× more records across all data categories and the complete landlord portfolio.
Risk rating

How 1075-1077 Valencia St's risk score is calculated

We trained a model on 7 years of SF DBI inspection data — notice of violation filings, complaint history, and owner track records. It estimates the probability that DBI inspectors will issue a Notice of Violation at this address in the next 12 months. Lower % = safer.

What the score means for you

Grade A–B — Low risk

DBI rarely finds violations here. Strong maintenance history and a clean complaint record.

Grade C — Moderate risk

Some past violations or complaints on record. Worth asking the landlord about any open issues before signing.

Grade D–F — High risk

Elevated violation and complaint history. DBI has found issues here before and is statistically likely to again.

Neighborhood percentile
17th percentile

Out of 2380 buildings in this neighborhood, 1975 are predicted to be safer.

RiskiestSafest
Predicted 12-month outcome
40%
No DBI
violation
60%
DBI violation
likely
Model explanation

What's driving this score

The three data points that most influenced this building's risk rating — ranked by the weight the model placed on each one.

Building size

Total floor area — a proxy for building scale and the number of systems (plumbing, electrical, HVAC) that can fail.

Number of units

The number of units affects how the model reads complaint and violation totals — more units means more potential sources.

Neighborhood location

Precise location is a proxy for neighborhood-level risk — some SF blocks have systematically higher DBI activity.

12-Month severity forecast
No violation 39.0%
Moderate concern 36.6%
Severe concern 24.4%
Estimated probability of receiving a DBI Notice of Violation in the next 12 months at each severity level. Model: full_hgb_balanced.
Apartment reviews

1075-1077 Valencia St apartment reviews

Real experiences from people who have lived here. Share yours to help other renters decide.

Share your experience — Help other renters by leaving an honest apartment review

Loading reviews…

On the map

Compare nearby alternatives

This building and nearby alternatives, color-coded by risk level. Click any marker to explore.

Buildings nearby
Loading…
The story over time

1075-1077 Valencia St event timeline

Violations, complaints, fire incidents, permits, and buyouts — most recent records in order.

2024
DBI Complaint Dec 03
Unpermitted banners left to blight and spread urban decay prove that current methods haven¿t worked and accountability is nonexistent. we must transition to a contract city model, replacing high-overhead public staff with private contractors who provide proactive services. this is more cost-effective, and contractors can be held responsible or dismissed if necessary. code enforcement must also be fully implemented, similar to mta ticketing. in this way, we will achieve our objectives citywide.(311 sr 101001106874)
Building Inspection Division

See all 3 events

Full history back to 2019 — violations, complaints, permits, buyouts, and fire incidents.

Unlock complete timeline
Every record we have

Full data for 1075-1077 Valencia St apartments

13 SF public datasets for this parcel — permits, violations, complaints, fire records, 311 calls, planning records, and buyouts.

Still apartment hunting in SF?

Look up the next apartment before you sign

Search any SF address free — no account needed to see the risk rating.

Simple pricing

Get the complete picture

Every plan unlocks the complete report: all 13 SF datasets, full history, landlord portfolio, and PDF & Excel exports.

Report Bundle

For the buildings you're deciding on right now

$10 one-time

~$3.33 per building. No subscription ever. Each credit unlocks one building's premium report for 30 days.

  • 3 full AI-powered reports
  • Download PDF reports
  • Advanced safety analysis
  • Compare multiple buildings
  • Credits never expire until you use them
  • Full public records (200 rows per dataset)
Buy 3 Reports — $10

Apartment Hunter

For a wide search across many buildings

$39 one-time

30 reports — ~$1.30 each. No subscription ever.

  • 30 full AI-powered reports
  • Download PDF reports
  • Advanced safety analysis
  • Compare multiple buildings
  • Credits never expire until you use them
  • Full public records (200 rows per dataset)
Buy 30 Reports — $39

Cancel anytime · Data sourced from SF Open Data, DBI, SFFD, SF Rent Board & Planning

Watch 1075-1077 Valencia St
Get alerted the moment a new violation or complaint is filed.